{"id":5070,"date":"2019-01-24T17:08:02","date_gmt":"2019-01-24T16:08:02","guid":{"rendered":"https:\/\/itwgse.com\/?p=5070"},"modified":"2019-02-08T12:33:18","modified_gmt":"2019-02-08T11:33:18","slug":"large-battery-charger-systems-cec","status":"publish","type":"post","link":"https:\/\/itwgse.com\/es\/news\/large-battery-charger-systems-cec\/","title":{"rendered":"APPROVED TEST LAB  &#8211; for large battery charger systems"},"content":{"rendered":"<p><strong>APPROVED TEST LAB<br \/>\n&#8211; for large battery charger systems<\/strong><\/p>\n<p>California Energy Commission (CEC) has approved ITW GSE, Odense as Test Laboratory for Large Battery Charger Systems.<\/p>\n<p>The regulations in California are very strict when it comes to unnecessary use of energy. As our very environmentally friendly <a href=\"https:\/\/itwgse.com\/products\/power\/itw-gse-7400-egpu\/\" target=\"_blank\" rel=\"noopener\">ITW GSE 7400 eGPU<\/a> includes a built-in battery charger, we have to obtain approval that the energy consumption of the complete product is in accordance with the regulations before we can sell it in California. A minor step, one should think, but\u2026 as we started searching for certified test laboratories in the US that could approve the 7400 eGPU, we soon found out that those were for small battery charges only.<\/p>\n<p>What to do?<br \/>\nAfter considering, ITW GSE applied to become a certified test center along with the supply of relevant documentation. On 12 December 2018, CEC approved ITW GSE as a certified test laboratory \u00a0and on 23 January 2019, we received approval of the \u00a0ITW GSE battery GPU. \u00a0We are proud to see our name and product on the website of the CEC among approved companies and products (see below).<\/p>\n<p>The physical proof of being in accordance with the rules and regulations of California is a visible BC marking at \u00a0the unit.<\/p>\n<p>We are happy that we can now sell the 7400 eGPU in California as well and contribute to making the state even greener as the eGPU reduces carbon emission by 95% compared to diesel units.<\/p>\n<p><em>ABOUT CEC<br \/>\nThe California Energy Commission was established in 1974 by the <\/em><a href=\"http:\/\/www.energy.ca.gov\/reports\/Warren-Alquist_Act\/\" target=\"_blank\" rel=\"noopener\"><em>Warren <\/em><em>\u2010<\/em><em> Alquist Act <\/em><\/a><em>. Governor Edmund G. Brown, Jr. appointed the first five commissioners in 1975. As the state&#8217;s primary energy policy and planning agency, the California Energy Commission is committed to reducing energy costs and environmental impacts of energy use &#8211; such as greenhouse gas emissions &#8211; while ensuring a safe, resilient, and reliable supply of energy.<\/em><\/p>\n<p><a href=\"https:\/\/cacertappliances.energy.ca.gov\/Pages\/ApplianceSearch.aspx\" target=\"_blank\" rel=\"noopener\">Read more<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-5071 size-large\" src=\"https:\/\/itwgse.com\/wp-content\/uploads\/2019\/01\/Approval_CEC_Website-1024x568.png\" alt=\"ITW GSE 7400 eGPU certified according to CEC regulations\" width=\"1024\" height=\"568\" srcset=\"https:\/\/itwgse.com\/wp-content\/uploads\/2019\/01\/Approval_CEC_Website-1024x568.png 1024w, https:\/\/itwgse.com\/wp-content\/uploads\/2019\/01\/Approval_CEC_Website-300x166.png 300w, https:\/\/itwgse.com\/wp-content\/uploads\/2019\/01\/Approval_CEC_Website.png 1706w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>APPROVED TEST LAB &#8211; for large battery charger systems California Energy Commission (CEC) has approved ITW GSE, Odense as Test Laboratory for Large Battery&#8230;<\/p>\n","protected":false},"author":11,"featured_media":5074,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-5070","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ikke-kategoriseret"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Large Battery Charger - Approved test lab (CEC) | ITW GSE<\/title>\n<meta name=\"description\" content=\"We are proud to announce that California Energy Commission (CEC) has approved ITW GSE, Odense as Test Laboratory for Large Battery Charger Systems.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Large Battery Charger - Approved test lab (CEC) | ITW GSE\" \/>\n<meta property=\"og:description\" content=\"We are proud to announce that California Energy Commission (CEC) has approved ITW GSE, Odense as Test Laboratory for Large Battery Charger Systems.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/\" \/>\n<meta property=\"og:site_name\" content=\"ITW GSE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ITWGSE\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-01-24T16:08:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-02-08T11:33:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/itwgse.com\/wp-content\/uploads\/2019\/01\/CEC-Approval.png\" \/>\n\t<meta property=\"og:image:width\" content=\"328\" \/>\n\t<meta property=\"og:image:height\" content=\"314\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Anna Dyg Ernst\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anna Dyg Ernst\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/\"},\"author\":{\"name\":\"Anna Dyg Ernst\",\"@id\":\"https:\/\/itwgse.com\/#\/schema\/person\/a5d0ec78a16b13ddeed24c30d1b3abfe\"},\"headline\":\"APPROVED TEST LAB &#8211; for large battery charger systems\",\"datePublished\":\"2019-01-24T16:08:02+00:00\",\"dateModified\":\"2019-02-08T11:33:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/\"},\"wordCount\":316,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/itwgse.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/itwgse.com\/wp-content\/uploads\/2019\/01\/CEC-Approval.png\",\"articleSection\":[\"Ikke-kategoriseret\"],\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/\",\"url\":\"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/\",\"name\":\"Large Battery Charger - Approved test lab (CEC) | ITW GSE\",\"isPartOf\":{\"@id\":\"https:\/\/itwgse.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/itwgse.com\/wp-content\/uploads\/2019\/01\/CEC-Approval.png\",\"datePublished\":\"2019-01-24T16:08:02+00:00\",\"dateModified\":\"2019-02-08T11:33:18+00:00\",\"description\":\"We are proud to announce that California Energy Commission (CEC) has approved ITW GSE, Odense as Test Laboratory for Large Battery Charger Systems.\",\"breadcrumb\":{\"@id\":\"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#primaryimage\",\"url\":\"https:\/\/itwgse.com\/wp-content\/uploads\/2019\/01\/CEC-Approval.png\",\"contentUrl\":\"https:\/\/itwgse.com\/wp-content\/uploads\/2019\/01\/CEC-Approval.png\",\"width\":328,\"height\":314,\"caption\":\"ITW GSE 7400, Approved by CEC, Large Battery Charger\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/itwgse.com\/es\/home\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"APPROVED TEST LAB &#8211; for large battery charger systems\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/itwgse.com\/#website\",\"url\":\"https:\/\/itwgse.com\/\",\"name\":\"ITW GSE\",\"description\":\"It&#039;s all about connections\",\"publisher\":{\"@id\":\"https:\/\/itwgse.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/itwgse.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/itwgse.com\/#organization\",\"name\":\"ITW GSE\",\"url\":\"https:\/\/itwgse.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/itwgse.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/itwgse.com\/wp-content\/uploads\/2018\/11\/logo.png\",\"contentUrl\":\"https:\/\/itwgse.com\/wp-content\/uploads\/2018\/11\/logo.png\",\"width\":302,\"height\":237,\"caption\":\"ITW GSE\"},\"image\":{\"@id\":\"https:\/\/itwgse.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ITWGSE\/\",\"https:\/\/www.linkedin.com\/company\/itw-gse\/\",\"https:\/\/www.youtube.com\/channel\/UCTUIMvyaOPfYIqzP8enZ8yw\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/itwgse.com\/#\/schema\/person\/a5d0ec78a16b13ddeed24c30d1b3abfe\",\"name\":\"Anna Dyg Ernst\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/itwgse.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/83b4d6e10e182dff5cdc3859bbdced5f5b331e42444bd79696582f4d3bbbbe9b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/83b4d6e10e182dff5cdc3859bbdced5f5b331e42444bd79696582f4d3bbbbe9b?s=96&d=mm&r=g\",\"caption\":\"Anna Dyg Ernst\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Large Battery Charger - Approved test lab (CEC) | ITW GSE","description":"We are proud to announce that California Energy Commission (CEC) has approved ITW GSE, Odense as Test Laboratory for Large Battery Charger Systems.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/","og_locale":"es_ES","og_type":"article","og_title":"Large Battery Charger - Approved test lab (CEC) | ITW GSE","og_description":"We are proud to announce that California Energy Commission (CEC) has approved ITW GSE, Odense as Test Laboratory for Large Battery Charger Systems.","og_url":"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/","og_site_name":"ITW GSE","article_publisher":"https:\/\/www.facebook.com\/ITWGSE\/","article_published_time":"2019-01-24T16:08:02+00:00","article_modified_time":"2019-02-08T11:33:18+00:00","og_image":[{"width":328,"height":314,"url":"https:\/\/itwgse.com\/wp-content\/uploads\/2019\/01\/CEC-Approval.png","type":"image\/png"}],"author":"Anna Dyg Ernst","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Anna Dyg Ernst","Tiempo de lectura":"2 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#article","isPartOf":{"@id":"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/"},"author":{"name":"Anna Dyg Ernst","@id":"https:\/\/itwgse.com\/#\/schema\/person\/a5d0ec78a16b13ddeed24c30d1b3abfe"},"headline":"APPROVED TEST LAB &#8211; for large battery charger systems","datePublished":"2019-01-24T16:08:02+00:00","dateModified":"2019-02-08T11:33:18+00:00","mainEntityOfPage":{"@id":"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/"},"wordCount":316,"commentCount":0,"publisher":{"@id":"https:\/\/itwgse.com\/#organization"},"image":{"@id":"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#primaryimage"},"thumbnailUrl":"https:\/\/itwgse.com\/wp-content\/uploads\/2019\/01\/CEC-Approval.png","articleSection":["Ikke-kategoriseret"],"inLanguage":"es","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/","url":"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/","name":"Large Battery Charger - Approved test lab (CEC) | ITW GSE","isPartOf":{"@id":"https:\/\/itwgse.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#primaryimage"},"image":{"@id":"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#primaryimage"},"thumbnailUrl":"https:\/\/itwgse.com\/wp-content\/uploads\/2019\/01\/CEC-Approval.png","datePublished":"2019-01-24T16:08:02+00:00","dateModified":"2019-02-08T11:33:18+00:00","description":"We are proud to announce that California Energy Commission (CEC) has approved ITW GSE, Odense as Test Laboratory for Large Battery Charger Systems.","breadcrumb":{"@id":"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#primaryimage","url":"https:\/\/itwgse.com\/wp-content\/uploads\/2019\/01\/CEC-Approval.png","contentUrl":"https:\/\/itwgse.com\/wp-content\/uploads\/2019\/01\/CEC-Approval.png","width":328,"height":314,"caption":"ITW GSE 7400, Approved by CEC, Large Battery Charger"},{"@type":"BreadcrumbList","@id":"https:\/\/itwgse.com\/news\/large-battery-charger-systems-cec\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/itwgse.com\/es\/home\/"},{"@type":"ListItem","position":2,"name":"APPROVED TEST LAB &#8211; for large battery charger systems"}]},{"@type":"WebSite","@id":"https:\/\/itwgse.com\/#website","url":"https:\/\/itwgse.com\/","name":"ITW GSE","description":"It&#039;s all about connections","publisher":{"@id":"https:\/\/itwgse.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/itwgse.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/itwgse.com\/#organization","name":"ITW GSE","url":"https:\/\/itwgse.com\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/itwgse.com\/#\/schema\/logo\/image\/","url":"https:\/\/itwgse.com\/wp-content\/uploads\/2018\/11\/logo.png","contentUrl":"https:\/\/itwgse.com\/wp-content\/uploads\/2018\/11\/logo.png","width":302,"height":237,"caption":"ITW GSE"},"image":{"@id":"https:\/\/itwgse.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ITWGSE\/","https:\/\/www.linkedin.com\/company\/itw-gse\/","https:\/\/www.youtube.com\/channel\/UCTUIMvyaOPfYIqzP8enZ8yw"]},{"@type":"Person","@id":"https:\/\/itwgse.com\/#\/schema\/person\/a5d0ec78a16b13ddeed24c30d1b3abfe","name":"Anna Dyg Ernst","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/itwgse.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/83b4d6e10e182dff5cdc3859bbdced5f5b331e42444bd79696582f4d3bbbbe9b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/83b4d6e10e182dff5cdc3859bbdced5f5b331e42444bd79696582f4d3bbbbe9b?s=96&d=mm&r=g","caption":"Anna Dyg Ernst"}}]}},"_links":{"self":[{"href":"https:\/\/itwgse.com\/es\/wp-json\/wp\/v2\/posts\/5070","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/itwgse.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/itwgse.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/itwgse.com\/es\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/itwgse.com\/es\/wp-json\/wp\/v2\/comments?post=5070"}],"version-history":[{"count":14,"href":"https:\/\/itwgse.com\/es\/wp-json\/wp\/v2\/posts\/5070\/revisions"}],"predecessor-version":[{"id":5219,"href":"https:\/\/itwgse.com\/es\/wp-json\/wp\/v2\/posts\/5070\/revisions\/5219"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/itwgse.com\/es\/wp-json\/wp\/v2\/media\/5074"}],"wp:attachment":[{"href":"https:\/\/itwgse.com\/es\/wp-json\/wp\/v2\/media?parent=5070"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/itwgse.com\/es\/wp-json\/wp\/v2\/categories?post=5070"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/itwgse.com\/es\/wp-json\/wp\/v2\/tags?post=5070"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}