search success chat google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
preloader

June 17, 2009

General Manager Celebrates 25 Year’s Jubilee

 Henrik Olsson Celebrates his 25 Year’s Jubilee

Photo of General Manager Henrik_OlssonYou are invited to join the small reception for Henrik at AXA Power, Smedebakken 31-33, 5270 Odense N on Tuesday 30. June 2009 from 12:00 – 13:00

Henrik Olsson graduated from Odense Teknikum back in 1984. Right after, Henrik started working in AXA’s technical department where he designed transformers, chargers as well as power supplies for aircraft. As a matter of fact, on a very chilly October night in 1987, Henrik did attend one of the very first tests of AXA Power’s actual star – a ground power supply for aircraft.  This took place in the local airport in Odense where the morning aircraft to Copenhagen was parked for the night. From 1991 through 1995, Henrik supplemented his engineering degree with bachelor of commerce degree

 

In 1990, Henrik was appointed  factory manager of AXA Power which at that time was situated in Otterup approx. 15 km North of Odense. Short after the sales of Axel Åkerman and AXA Power to the American industrial group ITW in year 2000, Henrik Olsson was appointed managing director of AXA Power. Henrik therefore has been the driving force behind the implementation of the ITW principles at the AXA Power factory which has led one better annual result than the other.

Henrik is very fond of jogging. Therefore, it was only natural that he initiated the AXA Power Exercise programme – AXA On The Move – where all employees either walk, run or ride their bike for half an hour each day – even on the day of celebration, the half an hour excercise is scheduled.

More news

May 24, 2019, posted in News

Congrats to Jan Berg – 40th Work Anniversary

Today we are celebrating Jan Berg for his 40 years with our company. Based in Odense, as a senior member of the production team,...

May 15, 2019, posted in News

Want to save 87.567 kg of CO2?

All you have to do is to replace just 1 diesel GPU by 1 eGPU to achieve CO2 savings of 87.567 kg! Simply Amazing....

Apr 12, 2019, posted in News

Okinawa Japan chooses ITW GSE Pre-Conditoned Air Units

AGP has decided to test the ITW GSE 3400 PCA 210 at Okinawa, Japan, which has a very high temperature and humidity. The installation...

Apr 12, 2019, posted in News

Visit from Finavia

This week, we had the pleasure of welcoming Finavia and our Finish distributor Jarmo Kosamo at Captium Security and Defence OY. Finavia has a...