search success chat google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
preloader

April 12, 2019

Okinawa Japan chooses ITW GSE Pre-Conditoned Air Units

AGP has decided to test the ITW GSE 3400 PCA 210 at Okinawa, Japan, which has a very high temperature and humidity. The installation is scheduled for June 2019. Therefore, our Japanese distributor Tamagawa, Mr. Kohei Kimura and 2 representatives from AGP has witnessed a successful factory acceptance test at the Danish facility of the ITW GSE PCA. The Japanese visitors were very impressed to see the PCA Climatic Test Chamber where temperatures and humity can be set similar to Okinawa. Thank you for coming all the way from Japan! And thanks to our Product Managers for Ground Power Systems Kim K. Pedersen and Product Manager Pre-Conditioned Air Systems Jesper Nielsen as well as our Senior Lead Engineer Lars Schrøder.

More news

Apr 12, 2019, posted in News

Visit from Finavia

This week, we had the pleasure of welcoming Finavia and our Finish distributor Jarmo Kosamo at Captium Security and Defence OY. Finavia has a...

Apr 12, 2019, posted in News

Sprechen Sie Deutch? Do you speak German?

Hallo deutschsprachige Kunden! Wussten Sie, dass unsere Webseite jetzt auf Deutsch verfügbar ist? Drücken Sie einfach die kleine Flagge im oberen Teil des web-sites,...

Apr 08, 2019, posted in News

Visualisation of Our Vision

Every day, the aviation industry is met with new and increasing requirements from airports wanting to go cleaner and greener. ITW GSE naturally takes...

Apr 05, 2019, posted in News

Engineering is in our blood!

Educating our distributors enables the end users to get fast local response. This week, technicians from Australia, Malaysia, Hong Kong, Thailand, Taiwan, New Zealand,...