search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

juillet 23, 2021

Top marks from Wärtsilä

WÄRTSILÄ who recently participated in a Factory Acceptance Test of a 90 kVA 400 Hz ground power unit including a 28 VDC output.

This unit will soon be shipped to Wärtsilä’s facility in Hamburg and from there, to the shipyard where the installation will take place.

Apart from approving the GPU, the two representatives from Wärtsilä gave top marks to the ITW GSE facility. They were taken by surprise by the relaxed atmosphere and the sharing of information already in the hallway where big posters show the Quality System, the production planning, and the overview of all employees.

Mrs. Karen Bethe, Quality Manager at Wärtsilä, especially noticed the availability of all appropriate testing tools plus the professionalism of the test engineers that “knew what they were talking about and could answer all questions”.

Mrs. Bethe further told that the 90 kVA unit was not the first order placed with ITW GSE.
Hopefully, it will not be the last either.

 

You can read about the unit here.

 

itw gse 2400 compact gpu Wärtsilä

More news

Mai 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

Mai 12, 2026, posted in News

Baden-Airpark GmbH investit dans des convertisseurs électriques au sol pour réduire les émissions de l’aéroport.

ITW GSE est fier de soutenir Baden-Airpark GmbH (FKB Airport) dans l’avancement de sa stratégie de réduction des émissions aéroportuaires avec la livraison de...

Mai 12, 2026, posted in News

Les bases aériennes modernes nécessitent plus qu’une infrastructure – elles ont besoin d’un soutien au sol intégré.

L’évolution de l’aviation militaire s’accompagne de celle des exigences imposées à l’infrastructure des bases aériennes. Les nouveaux hangars et installations ne sont qu’une partie...

Avr 22, 2026, posted in News

Les 5 principales procédures de maintenance annuelle de votre eGSE

Nous comprenons qu’étant donné que votre eGSE contient peu de pièces mobiles et des modules de batterie scellés, l’entretien est très limité. Cependant, il...