search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

septembre 09, 2021

Socially gearing up!

Yesterday evening, we had the pleasure of participating in the Danish DHL Relay – and what a success in so many aspects!

Reconnecting with team members from overseas is priceless and it was wonderful to feel the strong sense of belonging.

Some of us have not seen each other for more than 18 months, so the opportunity to gather up at a social and face-to-face event was much welcome!

The sporting results is a side benefit and for some, it’s fun to have the mockery right until our next race!

We meet every challenge!

 

itw gse running dhl relay 2021

 

itw gse running dhl relay 2021

 

itw gse running dhl relay 2021

More news

Mai 12, 2026, posted in News

Baden-Airpark GmbH investit dans des convertisseurs électriques au sol pour réduire les émissions de l’aéroport.

ITW GSE est fier de soutenir Baden-Airpark GmbH (FKB Airport) dans l’avancement de sa stratégie de réduction des émissions aéroportuaires avec la livraison de...

Mai 12, 2026, posted in News

Les bases aériennes modernes nécessitent plus qu’une infrastructure – elles ont besoin d’un soutien au sol intégré.

L’évolution de l’aviation militaire s’accompagne de celle des exigences imposées à l’infrastructure des bases aériennes. Les nouveaux hangars et installations ne sont qu’une partie...

Avr 22, 2026, posted in News

Les 5 principales procédures de maintenance annuelle de votre eGSE

Nous comprenons qu’étant donné que votre eGSE contient peu de pièces mobiles et des modules de batterie scellés, l’entretien est très limité. Cependant, il...

Avr 22, 2026, posted in News

Extension de nos installations en Europe !

Pour répondre à la demande mondiale croissante d’équipements de Ground Support Equipment durables, nous augmentons notre capacité de production européenne de 50 % et...