search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

septembre 24, 2015

Factory Acceptance Test of Houchin 4400 in the US

ITW GSE was very pleased to welcome Mr Roman Spilka, Ground Support Equipment Manager, from Czech Airlines Handling to our factory in Palmetto, Florida, USA to conduct a Factory Acceptance Test on their newly purchased Houchin 4400 GPU. Mr Spilka was very impressed with the size of our facility, how clean and efficient it was.

Following previous trials of the 4400 unit in Prague, Mr Spilka said: « we have had the opportunity to test the new Houchin 4400 Ground Power Unit for a few weeks. This unique Ground Power Unit features a compact design, full-size performance, which allows better mobility around aircraft, and it is easily handled. The new polyethylene canopy is corrosion free and much less heavy than the steel one, which we have on the Houchin C690 GPUs. The 4400 GPU is fuel efficient as it uses approximately 20% less of fuel than the current one. New control system gives us full information about the errors and its performance »
Photo Shows Roman Spilka and ITW GSE Area Sales Manager Jon Wells

Houchin 4400

More news

Mai 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

Mai 12, 2026, posted in News

Baden-Airpark GmbH investit dans des convertisseurs électriques au sol pour réduire les émissions de l’aéroport.

ITW GSE est fier de soutenir Baden-Airpark GmbH (FKB Airport) dans l’avancement de sa stratégie de réduction des émissions aéroportuaires avec la livraison de...

Mai 12, 2026, posted in News

Les bases aériennes modernes nécessitent plus qu’une infrastructure – elles ont besoin d’un soutien au sol intégré.

L’évolution de l’aviation militaire s’accompagne de celle des exigences imposées à l’infrastructure des bases aériennes. Les nouveaux hangars et installations ne sont qu’une partie...

Avr 22, 2026, posted in News

Les 5 principales procédures de maintenance annuelle de votre eGSE

Nous comprenons qu’étant donné que votre eGSE contient peu de pièces mobiles et des modules de batterie scellés, l’entretien est très limité. Cependant, il...