search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

septembre 19, 2012

Factory Acceptance Test Salalah Airport, Oman

AXA Power will deliver 16 pcs of 90 KVA Ground Power Units to Salalah  Airport in Oman, which are planned to be put into operation during spring 2013.

On 17. September, we therefore performed a Factory Aceptance Test of those units.

The new terminal at Salalah Airport envisages an expansion of capacity to 1 million passengers annually by 2014. However, the airport has been designed to allow for further expansions up to 6 million passengers per year.

More news

Août 20, 2026, posted in News

Team Spirit on the Move at the DHL Relay

Once again, colleagues from across ITW GSE came together for the annual DHL Relay in Odense – an evening that combines exercise, friendly competition...

Août 19, 2026, posted in News

Swivel Connector Solves Kinks at the Aircraft Connection Point

Efficient aircraft ground servicing depends on the safe and reliable transfer of fuel, air, and other utility services between ground support equipment (GSE) and...

Août 05, 2026, posted in News

Assurez la fluidité des cycles de production grâce à des connexions par câble fiables

Sur la rampe, un mauvais raccordement peut rapidement se transformer en problème opérationnel.   L’alimentation au sol des avions doit être fiable, facile à...

Août 05, 2026, posted in News

Contribuer à une nouvelle étape importante dans le domaine de l’aviation ultra-long-courrier

Une nouvelle référence en matière de vols ultra-long-courriers est en train de voir le jour, alors que Qantas s’apprête à mettre en service son...