search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

novembre 23, 2016

Kuwait Airways install AXA 2400 GPUs

Photo showing Mr. Dsouza, Mr. Al Mazidi from Kuwait Airways to the right David Feuga, Claus Frydenlund Hansen and René Vang Sørensen (to the left)
Photo showing Mr. Dsouza, Mr. Al Mazidi from Kuwait Airways to the right
David Feuga, Claus Frydenlund Hansen and René Vang Sørensen (to the left)

Kuwait Airways has operated AXA GPUs since the 1990ies! Therefore, it was with great pleasure that we received Eng. Ali Al Mazidi; Senior Expert Construction & Maintenance and Rocky Dsouza; Facility Management Engineer for the Factory Acceptance Test of 8 pcs of the AXA 2400 90kVA GPUs earlier this week. The units will be used in Kuwait Airway’s maintenance hangar that will for instance accommodate the A350 in a near future.
The compatibility with the A350, the facts that the AXA 2400 GPUs are of the latest technology which also includes a unique voltage at output due to the Plug & Play system + that the 2400 units are compact and easy to maintain are some of the reasons why Kuwait Airways chose the AXA 2400 GPUs. During the visit, Mr. Al Mazidi and Mr. Dsouza also had the opportunity to get a thorough introduction to the AXA Power Coil and the AXA Power PCA that would be ideal products for the future development of Kuwait Int’l Airport.

More news

Mai 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

Mai 12, 2026, posted in News

Baden-Airpark GmbH investit dans des convertisseurs électriques au sol pour réduire les émissions de l’aéroport.

ITW GSE est fier de soutenir Baden-Airpark GmbH (FKB Airport) dans l’avancement de sa stratégie de réduction des émissions aéroportuaires avec la livraison de...

Mai 12, 2026, posted in News

Les bases aériennes modernes nécessitent plus qu’une infrastructure – elles ont besoin d’un soutien au sol intégré.

L’évolution de l’aviation militaire s’accompagne de celle des exigences imposées à l’infrastructure des bases aériennes. Les nouveaux hangars et installations ne sont qu’une partie...

Avr 22, 2026, posted in News

Les 5 principales procédures de maintenance annuelle de votre eGSE

Nous comprenons qu’étant donné que votre eGSE contient peu de pièces mobiles et des modules de batterie scellés, l’entretien est très limité. Cependant, il...