search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

mars 16, 2015

Visit from Former Hobart Engineer

Larry Heisey

Hobart is honored to have Larry Heisey, former Hobart Engineer visit our facility in Palmetto, Florida. Larry worked as the head of Engineering at Hobart Ground Power in Troy, Ohio and was instrumental in the creation of many designs that are the foundation of our product lines today.

Larry and his wife were visiting in Florida and came in to tour the facility and meet the team. Thank you for coming by Larry!

Pictured (L-R): Larry Heisey, Hobart Engineer (retired), Dave Leadingham, Engineering & Operations Manager.

More news

Avr 22, 2026, posted in News

Les 5 principales procédures de maintenance annuelle de votre eGSE

Nous comprenons qu’étant donné que votre eGSE contient peu de pièces mobiles et des modules de batterie scellés, l’entretien est très limité. Cependant, il...

Avr 22, 2026, posted in News

Extension de nos installations en Europe !

Pour répondre à la demande mondiale croissante d’équipements de Ground Support Equipment durables, nous augmentons notre capacité de production européenne de 50 % et...

Avr 22, 2026, posted in News

Un choix intelligent en entrée : Les eGPUs ITW GSE 7400 à l’aéroport de Naples

Cet été, nous avons eu le plaisir de nous rendre à l’aéroport de Naples pour observer les performances de nos convertisseursseurs électriques au sol...

Avr 22, 2026, posted in News

Comment le secteur de la manutention au sol peut-il devenir plus durable ?

La durabilité devient une priorité essentielle dans l’aviation, et la manutention au sol joue un rôle important dans la réduction des émissions dans les...