search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

novembre 15, 2016

Newcastle Airport Operates AXA 2400 Power Coil

Back in June, Newcastle Airport installed an AXA 2400 Power Coil. Although the staff has not received product training so far, they have operated the Power Coil ever since, told Senior Engineering Technician Neil Pringle who has been at AXA Power for training in the operation and the maintenance the unit for the past days.
Apart from gaining intense and valuable knowledge about the Power Coil, Neil also made more cross cultural observations during his first visit to Denmark. He very much appreciated the nice lunch at the factory where everybody sits together discussing and chatting independently of working deparments. Another thing that he mentioned was the lack of shops in the villages. In his home country, a village of 4000 inhabitants would have at least two shops and five pubs. In Denmark there are none. Finally, Neil  took the opportunity to tell us about the beautiful landscapes and the nice beaches very close to Newcastle which made us envious to visit those places. A very sympathetic exchange of similarities and differences. We are glad to hear that Newcastle Airport are satisfied with our AXA 2400 Power Coil.

More news

Juil 10, 2026, posted in News

ITW GSE Power Share désigné « Produit phare de l’année »

Une innovation primée pour la rampe électrique Nous sommes fiers d’annoncer que Power Share a été désigné « Leader produit de l’année » par...

Juil 10, 2026, posted in News

Une journée consacrée à la sécurité, à la sensibilisation et au travail d’équipe

Chez ITW GSE, la sécurité est une responsabilité partagée. Notre philosophie est simple : tous les accidents peuvent être évités si nous restons vigilants,...

Juil 10, 2026, posted in News

Des perspectives de croissance accrues chez ITW GSE

ITW GSE poursuit sa croissance — tout comme nos installations. Suite à l’agrandissement récent de notre site de production de 2 300 m², nous...

Juin 12, 2026, posted in News

Les objectifs de durabilité des aéroports de l’UE stimulent la demande en solutions PCA flexibles

Les aéroports européens sont soumis à une pression croissante pour réduire leurs émissions, améliorer leur efficacité énergétique et accélérer la transition vers des opérations...