search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

mars 03, 2015

Tamagawa Visits Palmetto

tamagawa visits palmetto Tamagawa Aero Systems Co., Ltd.

Tamagawa Aero Systems Co., Ltd.

This week, Kunzo ‘Kent’ Asami with Tamagawa Aero Systems Co., Ltd. visited the factory in Palmetto, Florida. During his visit, he toured the factory and met with the team in sales, spares and service.

Pictured (L-R) are Kathleen Burns, ITW GSE; Kunzo ‘Kent’ Asami, Tamagawa; Pat Tipton, ITW GSE.

More news

Sep 30, 2026, posted in News

Looking for more GSE knowledge?

Ground support operations are changing. Electrification, charging infrastructure, aircraft power and cooling, and sustainability are just some of the topics shaping the decisions airports,...

Sep 24, 2026, posted in News

Open job position: Field Service Engineer

We are looking for an additional team member for our US Support team – are you the one? Your daily tasks will include a...

Sep 17, 2026, posted in News

Limited grid capacity? Put available gate power to work

As airports and ground handlers electrify more Ground Support Equipment, charging capacity can quickly become a challenge. ITW GSE Power Share is designed to...

Sep 11, 2026, posted in News

Un raccord pivotant résout le problème des pliures au niveau du point de raccordement de l’avion

L’efficacité de l’assistance au sol des aéronefs repose sur un transfert sûr et fiable du carburant, de l’air et des autres services utilitaires entre...