search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

juillet 08, 2010

Visit from Bahrain

Factory Acceptance Test
of GPUs for Bahrain International Airport

visit_from_Bahrain_2010.jpg

 

We are pleased to announce the visit of Mr. Nasri Wadie Najib Far, company Dar Al Handasah, Mr. Santhosh Deusecar, company Jacob Gibb Ltd. as well as Mr. V.B.Giri, company Cavotec who are attending the factory acceptance test of the 21 pcs of AXA Power GPUs to be installed at the Bahrain International Airport later this year. The photo also show Project Manager Mr. Brian Hou Nielsen who assists the visitors during the testing.

More news

Août 27, 2026, posted in News

Celebrating Josie’s contributions at ITW GSE

After two productive months with our US production team, we recently said goodbye to our Process Engineering Intern, Josie P.   During her 4-months...

Août 20, 2026, posted in News

Team Spirit on the Move at the DHL Relay

Once again, colleagues from across ITW GSE came together for the annual DHL Relay in Odense – an evening that combines exercise, friendly competition...

Août 19, 2026, posted in News

Swivel Connector Solves Kinks at the Aircraft Connection Point

Efficient aircraft ground servicing depends on the safe and reliable transfer of fuel, air, and other utility services between ground support equipment (GSE) and...

Août 05, 2026, posted in News

Assurez la fluidité des cycles de production grâce à des connexions par câble fiables

Sur la rampe, un mauvais raccordement peut rapidement se transformer en problème opérationnel.   L’alimentation au sol des avions doit être fiable, facile à...