search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

octobre 01, 2010

Visit from Oman

Factory Acceptance Test
of GPUs for Muscat Intl. Airport, Oman

Last week, we had the pleasure of welcoming

Mr.Fouad Jekki , ADPi

Mr. Steffen Julsrud, Cowi Larsen JV

Mr. Ercan Durak, CC TAV

Mr. Ramanujam Padmanaban, Bahwan Engineering

Mr. Wahhed Sattikar, National Trading & Projects Co L.L.C

AXA Power was represented by Vice President Intl. Sales & Marketing Poul Elvstrøm and Product Manager Kim K. Pedersen

The gentlemen witnessed the factory acceptance test of the 34 pcs of AXA Power GPUs to be installed in Muscat Intl. Airport.

FAT_Muscat_Intl.jpg

More news

Oct 09, 2026, posted in News

La capacité du réseau est limitée ? Exploitez la puissance disponible au niveau des portes

À mesure que les aéroports et les prestataires de services au sol électrifient un nombre croissant d’équipements de Ground Support Equipment, la capacité de...

Oct 09, 2026, posted in News

Offre d’emploi : Ingénieur de maintenance sur site

Nous recherchons un nouveau collaborateur pour notre équipe d’assistance aux États-Unis. Serait-ce vous ? Vos missions quotidiennes comprendront un large éventail de tâches, tant...

Oct 09, 2026, posted in News

Vous souhaitez en savoir plus sur le GSE ?

Les opérations d’assistance au sol évoluent. L’électrification, les infrastructures de recharge, l’alimentation électrique et le refroidissement des avions, ainsi que le développement durable ne...

Oct 09, 2026, posted in News

Évoluer aux côtés de l’équipe : les nouveaux locaux prennent forme chez ITW GSE

Notre équipe ne cesse de s’agrandir – et nos locaux s’agrandissent désormais avec nous. Cet été, il y avait de quoi s’émerveiller depuis les...