search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

avril 05, 2016

Visit from Statron

On April 22.-23., we had the pleasure of welcoming our partner Statron. During the two days, Service & Commissioning Engineer René Vang Sørensen taught the Statron team all  about the AXA 2400 series of GPUs
ITW GSE AXA Power thanks Gerald Dosch and Michael Badouin from Germany as well as Claudio Hegglin and Marco Kempf from Switzerland for investing time in becoming product experts for the benefit of German and Swiss customers! It was great having you here.

Below photo shows the new Experts along with René (second left)

More news

Sep 24, 2026, posted in News

Open job position: Field Service Engineer

We are looking for an additional team member for our US Support team – are you the one? Your daily tasks will include a...

Sep 17, 2026, posted in News

Limited grid capacity? Put available gate power to work

As airports and ground handlers electrify more Ground Support Equipment, charging capacity can quickly become a challenge. ITW GSE Power Share is designed to...

Sep 11, 2026, posted in News

Hommage aux réalisations de Josie au sein d’ITW GSE

Après deux mois fructueux passés au sein de notre équipe de production aux États-Unis, nous avons récemment fait nos adieux à notre stagiaire en...

Sep 11, 2026, posted in News

Un raccord pivotant résout le problème des pliures au niveau du point de raccordement de l’avion

L’efficacité de l’assistance au sol des aéronefs repose sur un transfert sûr et fiable du carburant, de l’air et des autres services utilitaires entre...