search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Power by the Hour
preloader

septiembre 29, 2016

Product Training AXA 2300 & AXA 2400

For the past two days, we had the pleasure of welcoming Charlie Green and Charles Lenihan from Emcor, UK (London Heathrow) as well as Chen Shixiong from Tianda, P R China. Together with Service Engineer Jeyalingam Kathirgamathambi, the gentlemen went through a training of the AXA 2300 and the AXA 2400 series. They especially fancy that the AXA 2400 unit provides PF1 voltage and as such can supply the all types of aircraft. Also the new display f the 2400 series is an advantage. Although everything went well, it was hard for the photographer to make the gentlemen smile…but after more attempts, we finally succeded.

Factory Acceptance Test AXA 2400

A picture of the four gentlemen after a good session of product training.

More news

Nov 21, 2024, posted in News

Solving the electric infrastructure challenges

Watch Senior Sales Manager, Jose Manuel De Las Heras reveal our new charging solutions. Some airports lack eGSE charging possibilities due to grid limitations,...

Nov 19, 2024, posted in News

Is your eGPU ready for winter?

Here’s how to keep it performing at its best in colder months!  Perform Pre-Winter Maintenance: Start with a comprehensive check of the eGPU’s battery,...

Oct 10, 2024, posted in News

dnata adds 14 electric ground power units (GPUs) to Dubai fleet

US$ four million investment is part of air services provider’s ongoing efforts to move away from fossil-fuel engines New equipment to reduce fuel consumption...

Sep 26, 2024, posted in News

Power Back to the Grid!

‘Recycling’ energy from quality tests is now going full scale! Back in March, we announced that we had started ‘recycling’ the power used during...