search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

octobre 04, 2021

A hybrid Factory Acceptance Test successfully completed!

Collaboration, planning, testing, rescheduling, some more planning, and then finally executing!

This is the working wheel for the completed hybrid FAT: a Factory Acceptance Test with in-person participants along with participants joining via online channels.

The project involves 48 x Power coils and 40 x 3400 PCA units soon to be delivered, installed and operating in Bangalore International Airport, India.

 

Thank you to all involved parties – it is a pleasure collaborating with you!

itw gse factory acceptance test

 

itw gse factory acceptance test

 

More news

Mai 12, 2026, posted in News

Baden-Airpark GmbH investit dans des convertisseurs électriques au sol pour réduire les émissions de l’aéroport.

ITW GSE est fier de soutenir Baden-Airpark GmbH (FKB Airport) dans l’avancement de sa stratégie de réduction des émissions aéroportuaires avec la livraison de...

Mai 12, 2026, posted in News

Les bases aériennes modernes nécessitent plus qu’une infrastructure – elles ont besoin d’un soutien au sol intégré.

L’évolution de l’aviation militaire s’accompagne de celle des exigences imposées à l’infrastructure des bases aériennes. Les nouveaux hangars et installations ne sont qu’une partie...

Avr 22, 2026, posted in News

Les 5 principales procédures de maintenance annuelle de votre eGSE

Nous comprenons qu’étant donné que votre eGSE contient peu de pièces mobiles et des modules de batterie scellés, l’entretien est très limité. Cependant, il...

Avr 22, 2026, posted in News

Extension de nos installations en Europe !

Pour répondre à la demande mondiale croissante d’équipements de Ground Support Equipment durables, nous augmentons notre capacité de production européenne de 50 % et...