search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

juillet 22, 2019

Power To Lyon Airport

To ensure a smooth 400 Hz supply to all stands, Lyon airport will soon replace their 5 semi-centralized systems by 20 pcs of 90 kVA ITW GSE 2400 GPUs. The new 400 Hz units, equipped with the Plug&Play feature that automatically regulates the voltage at the aircraft plug, will be placed close to the point-of-use.

During the factory test that took place in the presence of M. Gilles Robert, M. Julien Castaldi and M. Paul Enri Flesch from Lyon Airport, the ISO 6858 requirements with regard to balanced and unbalanced loads were verified and proved.

For many years, Lyon Airport has been a loyal customer and today, the airport has more than 50 pcs of 400 Hz GPUs from ITW plus a number of 28 VDC units as well.

Congratulations to the airport with their choice of the One Converter – One Plug concept for the semi-centralized stands. We hope that the steady supply leave you time to do other jobs.

To ensure a smooth 400 Hz supply to all stands, Lyon airport will soon replace their 5 semi-centralized systems by 20 pcs of 90 kVA ITW GSE 2400 GPUs. The new 400 Hz units, equipped with the Plug&Play feature that automatically regulates the voltage at the aircraft plug, will be placed close to the point-of-use.

Congratulations to the airport with their choice of the One Converter – One Plug concept for the semi-centralized stands. We hope that the steady supply leave you time to do other jobs.

Factory Acceptance Test ITW GSE 2400 GPUs for Lyon Airport
Julien Castaldi, Lyon Airport and Alain Gargou monitoring the performance of the ITW GSE 2400 GPU

More news

Sep 11, 2026, posted in News

Un raccord pivotant résout le problème des pliures au niveau du point de raccordement de l’avion

L’efficacité de l’assistance au sol des aéronefs repose sur un transfert sûr et fiable du carburant, de l’air et des autres services utilitaires entre...

Sep 11, 2026, posted in News

Hommage aux réalisations de Josie au sein d’ITW GSE

Après deux mois fructueux passés au sein de notre équipe de production aux États-Unis, nous avons récemment fait nos adieux à notre stagiaire en...

Sep 11, 2026, posted in News

Célébrons les 40 années d’ITW GSE

Félicitations à Kim Koustrup Pedersen pour ces quatre décennies de dévouement, d’expertise technique et d’engagement au sein d’ITW GSE ITW GSE vient de célébrer...

Sep 11, 2026, posted in News

L’esprit d’équipe à l’honneur lors du relais DHL

Une fois de plus, des collègues de l’ensemble d’ITW GSE se sont retrouvés à Odense pour le relais annuel DHL : une soirée qui...