search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

July 22, 2019

Power To Lyon Airport

To ensure a smooth 400 Hz supply to all stands, Lyon airport will soon replace their 5 semi-centralized systems by 20 pcs of 90 kVA ITW GSE 2400 GPUs. The new 400 Hz units, equipped with the Plug&Play feature that automatically regulates the voltage at the aircraft plug, will be placed close to the point-of-use.

During the factory test that took place in the presence of M. Gilles Robert, M. Julien Castaldi and M. Paul Enri Flesch from Lyon Airport, the ISO 6858 requirements with regard to balanced and unbalanced loads were verified and proved.

For many years, Lyon Airport has been a loyal customer and today, the airport has more than 50 pcs of 400 Hz GPUs from ITW plus a number of 28 VDC units as well.

Congratulations to the airport with their choice of the One Converter – One Plug concept for the semi-centralized stands. We hope that the steady supply leave you time to do other jobs.

To ensure a smooth 400 Hz supply to all stands, Lyon airport will soon replace their 5 semi-centralized systems by 20 pcs of 90 kVA ITW GSE 2400 GPUs. The new 400 Hz units, equipped with the Plug&Play feature that automatically regulates the voltage at the aircraft plug, will be placed close to the point-of-use.

Congratulations to the airport with their choice of the One Converter – One Plug concept for the semi-centralized stands. We hope that the steady supply leave you time to do other jobs.

Factory Acceptance Test ITW GSE 2400 GPUs for Lyon Airport
Julien Castaldi, Lyon Airport and Alain Gargou monitoring the performance of the ITW GSE 2400 GPU

More news

Aug 04, 2026, posted in News

Supporting a New Milestone in Ultra-Long-Haul Aviation

A new benchmark for ultra-long-haul travel is taking shape as Qantas prepares to introduce its Airbus A350-1000 Ultra Long Range aircraft as part of...

Jul 23, 2026, posted in News

It’s All About Connections. Ready to Build Yours?

(Open job position)   Connections between airports and airlines. Between technology and performance. Between customers and trusted partners. And most importantly, between great people....

Jul 16, 2026, posted in News

Keep Turnarounds Moving with Reliable Cable Connections

On the ramp, a poor connection can quickly become an operational problem.   Aircraft ground power must be reliable, easy to handle, and ready...

Jul 02, 2026, posted in News

More Room for Growth at ITW GSE

ITW GSE continues to grow — and so do our facilities. Following the recent 2,300 m² expansion of our production site, we are now...