search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

July 22, 2019

Power To Lyon Airport

To ensure a smooth 400 Hz supply to all stands, Lyon airport will soon replace their 5 semi-centralized systems by 20 pcs of 90 kVA ITW GSE 2400 GPUs. The new 400 Hz units, equipped with the Plug&Play feature that automatically regulates the voltage at the aircraft plug, will be placed close to the point-of-use.

During the factory test that took place in the presence of M. Gilles Robert, M. Julien Castaldi and M. Paul Enri Flesch from Lyon Airport, the ISO 6858 requirements with regard to balanced and unbalanced loads were verified and proved.

For many years, Lyon Airport has been a loyal customer and today, the airport has more than 50 pcs of 400 Hz GPUs from ITW plus a number of 28 VDC units as well.

Congratulations to the airport with their choice of the One Converter – One Plug concept for the semi-centralized stands. We hope that the steady supply leave you time to do other jobs.

To ensure a smooth 400 Hz supply to all stands, Lyon airport will soon replace their 5 semi-centralized systems by 20 pcs of 90 kVA ITW GSE 2400 GPUs. The new 400 Hz units, equipped with the Plug&Play feature that automatically regulates the voltage at the aircraft plug, will be placed close to the point-of-use.

Congratulations to the airport with their choice of the One Converter – One Plug concept for the semi-centralized stands. We hope that the steady supply leave you time to do other jobs.

Factory Acceptance Test ITW GSE 2400 GPUs for Lyon Airport
Julien Castaldi, Lyon Airport and Alain Gargou monitoring the performance of the ITW GSE 2400 GPU

More news

Sep 08, 2026, posted in News

More than aircraft power: 7400 eGPU adds AUX outlets

The battery capacity in an eGPU can do more than supply 400 Hz aircraft power. With new optional AUX outlets, the ITW GSE 7400...

Aug 31, 2026, posted in News

Celebrating 40 years with ITW GSE

Congratulations to Kim Koustrup Pedersen on four decades of dedication, technical expertise and commitment to ITW GSE ITW GSE just celebrated an impressive milestone...

Aug 27, 2026, posted in News

Celebrating Josie’s contributions at ITW GSE

After two productive months with our US production team, we recently said goodbye to our Process Engineering Intern, Josie P.   During her 4-months...

Aug 20, 2026, posted in News

Team Spirit on the Move at the DHL Relay

Once again, colleagues from across ITW GSE came together for the annual DHL Relay in Odense – an evening that combines exercise, friendly competition...