fbpx search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
Power by the Hour
preloader

July 22, 2019

Power To Lyon Airport

To ensure a smooth 400 Hz supply to all stands, Lyon airport will soon replace their 5 semi-centralized systems by 20 pcs of 90 kVA ITW GSE 2400 GPUs. The new 400 Hz units, equipped with the Plug&Play feature that automatically regulates the voltage at the aircraft plug, will be placed close to the point-of-use.

During the factory test that took place in the presence of M. Gilles Robert, M. Julien Castaldi and M. Paul Enri Flesch from Lyon Airport, the ISO 6858 requirements with regard to balanced and unbalanced loads were verified and proved.

For many years, Lyon Airport has been a loyal customer and today, the airport has more than 50 pcs of 400 Hz GPUs from ITW plus a number of 28 VDC units as well.

Congratulations to the airport with their choice of the One Converter – One Plug concept for the semi-centralized stands. We hope that the steady supply leave you time to do other jobs.

To ensure a smooth 400 Hz supply to all stands, Lyon airport will soon replace their 5 semi-centralized systems by 20 pcs of 90 kVA ITW GSE 2400 GPUs. The new 400 Hz units, equipped with the Plug&Play feature that automatically regulates the voltage at the aircraft plug, will be placed close to the point-of-use.

Congratulations to the airport with their choice of the One Converter – One Plug concept for the semi-centralized stands. We hope that the steady supply leave you time to do other jobs.

Factory Acceptance Test ITW GSE 2400 GPUs for Lyon Airport
Julien Castaldi, Lyon Airport and Alain Gargou monitoring the performance of the ITW GSE 2400 GPU

More news

Aug 24, 2023, posted in News

The DHL Relay Race 2023!

Once again we took off for a run or powerwalk and enjoyed each others’ company.  One of our annual sporty and social team events...

Aug 15, 2023, posted in News

What is the TEN-T guidelines?

Well, they’re the Trans-European Transport Network by the European Parliament. Included in these guidelines are airport energy and operational efficiency. We find the TEN-T...

Jun 01, 2023, posted in News

11 Gates… 1 Terminal

Big project at JFK’s Terminal 4! The project included the installation of passenger boarding bridges with new 400 Hz/28 VDC Combination GPUs and 45-ton...

May 17, 2023, posted in News

ITW GSE 3500 PCA awarded the 2023 Ground Support Worldwide Product Leader of the Year

With features designed to reduce infrastructure costs and lower energy consumption, the ITW GSE 3500 PCA has been named the 2023 Ground Support Worldwide...