search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

juin 30, 2015

Congratulations Rabat Salé Airport Morocco

Rabat Salé Airport

We congratulate Rabat Salé Airport, Morocco with the upgrade of their new Terminal that was inaugurated in 2012. With 4 new passenger boarding bridges from Tianda, the passengers can walk  comfortably to the aircraft. And the AXA Power Coils that are installed under the bridges will ensure an on-time departure of the flights.

ITW GSE Service Engineer Alain Gargou just sent these nice photos from Morocco where he commissioned the AXA 2300 Power Coils last week.
The terminal is 16,000 m² large and has a maximum capacity of 3.5 million passengers/year

 

 

 

More news

Juil 10, 2026, posted in News

ITW GSE Power Share désigné « Produit phare de l’année »

Une innovation primée pour la rampe électrique Nous sommes fiers d’annoncer que Power Share a été désigné « Leader produit de l’année » par...

Juil 10, 2026, posted in News

Une journée consacrée à la sécurité, à la sensibilisation et au travail d’équipe

Chez ITW GSE, la sécurité est une responsabilité partagée. Notre philosophie est simple : tous les accidents peuvent être évités si nous restons vigilants,...

Juil 10, 2026, posted in News

Des perspectives de croissance accrues chez ITW GSE

ITW GSE poursuit sa croissance — tout comme nos installations. Suite à l’agrandissement récent de notre site de production de 2 300 m², nous...

Juin 12, 2026, posted in News

Les objectifs de durabilité des aéroports de l’UE stimulent la demande en solutions PCA flexibles

Les aéroports européens sont soumis à une pression croissante pour réduire leurs émissions, améliorer leur efficacité énergétique et accélérer la transition vers des opérations...