search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

Juni 30, 2015

Congratulations Rabat Salé Airport Morocco

Rabat Salé Airport

We congratulate Rabat Salé Airport, Morocco with the upgrade of their new Terminal that was inaugurated in 2012. With 4 new passenger boarding bridges from Tianda, the passengers can walk  comfortably to the aircraft. And the AXA Power Coils that are installed under the bridges will ensure an on-time departure of the flights.

ITW GSE Service Engineer Alain Gargou just sent these nice photos from Morocco where he commissioned the AXA 2300 Power Coils last week.
The terminal is 16,000 m² large and has a maximum capacity of 3.5 million passengers/year

 

 

 

More news

Apr. 22, 2026, posted in News

Die 5 wichtigsten jährlichen Wartungsmaßnahmen für Ihre eGSE

Da Ihr eGSE nur wenige bewegliche Teile und versiegelte Batteriemodule enthält, ist die Wartung sehr gering. Es gibt jedoch 5 Dinge, die Sie in...

Apr. 22, 2026, posted in News

Eine intelligente Wahl in Aktion: Die ITW GSE 7400 eGPUs am Flughafen von Neapel

In diesem Sommer hatten wir das Vergnügen, die Flughafenbehörde von Neapel zu besuchen, um zu sehen, wie unsere elektrischen GPUs im realen Betrieb funktionieren....

Apr. 22, 2026, posted in News

Wir erweitern unsere europäischen Einrichtungen!

Um die weltweit wachsende Nachfrage nach nachhaltigen Bodengeräten zu befriedigen, erweitern wir unsere Produktionskapazität in Europa um 50% und bauen 3.000 Quadratmeter neue Lagerfläche...

Apr. 22, 2026, posted in News

Internationaler Flughafen Noida bereitet sich mit elektrifiziertem Flugsteigbetrieb auf den Abflug vor

Während die Eröffnung des Noida International Airport immer näher rückt, ist ein wichtiger Teil seiner Betriebseinrichtung bereits vorhanden: eine elektrifizierte Gate-Infrastruktur, die eine effiziente,...