Aircraft Power Ratings
Which rating does my aircraft require ?
Are you in doubt, consult the listing and feel free to share information by adding aircraft and power ratings to the list
-
A380 - Category F Aircraft
The A380 is a power factor 1 aircraft. This aircraft has 4 inlets and requires 4x90 kVA according to Airbus
-
B787 - Category E Aircraft
The B787 is a power factor 1 aircraft. It has 3 power inlets and requires 3 x 90 kVA.
-
B777 - Category 4E Aircraft
The B777 is a power factor 0.8 aircraft. It has 2 power inlets and requires 2 x 90 kVA GPUs
-
B747-8 - Category F Aircraft
The B747-8 is a power factor 0.8-1 aircraft. It has 2 power inlets and requires 2 x 90 kVA Ground Power Units
-
A350 - Category 4E Aircraft
Is a power factor 1 aircraft. It is equipped with 2 power inlets and requires 2 x 90 kVA ground Power Units
-
B747-300/400 - Category 4E Aircraft
Requires power factor 0.8-1, have 2 inlets, and requires 2 x 90 kVA GPUs
-
A340 - Category 4E Aircraft
Requires power factor 0.8, have 2 power inlets and requires 2 x 90 kVA GPUs
-
A330 - Category 4E Aircraft
Requires power factor 0.8, have 2 power inlets and requires 2 x 90 kVA GPUs
-
B767-400 - Category 4D Aircraft
Power factor 0.8. Aircraft Equipped with 2 power inlets, and requires 2 x 90 kVA GPUs
-
MD90 - Category 4D Aircraft
Power factor 0.8. Aircraft Equipped with 1 external power inlet, and Requires 1 x 90 kVA GPU
-
A300 - A600 - Category 4D Aircraft
Power factor 0.8. Aircraft Equipped with 1 external power inlet, and requires 1 x 90 kVA GPU
-
DC8 - DC9 - DC10 aircrafts
Power Factor 0.8, 1power inlet and requires 1 x 90 kVA GPU
-
L1011 - Category 4D Aircraft
Power Factor 0.8, 1 power inlet, and requires 1 x 90 kVA GPU
-
A318 - Category 4C Aircarft
Power Factor: 0.8, 1 power inlet, and requires 1 x 90 kVA GPU
-
A319 - Category 4C Aircarft
Power Factor: 0.8, 1 power inlet, and requires 1 x 90 kVA GPU
-
A320 - Category 4C Aircarft
Power Factor: 0.8, 1 power inlet, and requires 1 x 90 kVA GPU
-
MD80 - Category 4C Aircraft
Power Factor: 0.8, 1 power inlet and Requires 1 x 90 kVA GPU
The leading supplier of Ground Power Units, Pre-Conditioned Air Units, Cables and Hoses
Check out our product range in the four boxes below:
News & Exhibitions
The DHL Relay Race 2023!
Once again we took off for a run or powerwalk and enjoyed each others‘ company. One of our annual sporty and social team events...
What is the TEN-T guidelines?
Well, they’re the Trans-European Transport Network by the European Parliament. Included in these guidelines are airport energy and operational efficiency. We find the TEN-T...
11 Gates… 1 Terminal
Big project at JFK’s Terminal 4! The project included the installation of passenger boarding bridges with new 400 Hz/28 VDC Combination GPUs and 45-ton...
ACI-NA 2023
There is lots to talk about in our developing industry and this conference touches on those forward-thinking topics. Stay ahead of emerging trends by…