search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

septembre 23, 2016

AXA 2400 Installed at London Heathrow Airport

ITW GSE AXA Power’s UK Service Partner, JLC Aviation Services Ltd, have recently completed the upgrade of 3 x British Airways stands serving their B787-8 fleet of aircraft at their principal Maintenance Base at Heathrow Airport.

The photo shows 2 x AXA 2400 90 kVA GPUs  together with a cable crocodile which was retained from the former installation. An A380 aircraft supplies the background scenery!

A total of 6 x AXA 2400 90 kVA GPUs and 2 x AXA 90 kVA mobiles complete this project and compliment more than 60 AXA GPUs already in active service across the site

.

More news

Oct 09, 2026, posted in News

La capacité du réseau est limitée ? Exploitez la puissance disponible au niveau des portes

À mesure que les aéroports et les prestataires de services au sol électrifient un nombre croissant d’équipements de Ground Support Equipment, la capacité de...

Oct 09, 2026, posted in News

Offre d’emploi : Ingénieur de maintenance sur site

Nous recherchons un nouveau collaborateur pour notre équipe d’assistance aux États-Unis. Serait-ce vous ? Vos missions quotidiennes comprendront un large éventail de tâches, tant...

Oct 09, 2026, posted in News

Vous souhaitez en savoir plus sur le GSE ?

Les opérations d’assistance au sol évoluent. L’électrification, les infrastructures de recharge, l’alimentation électrique et le refroidissement des avions, ainsi que le développement durable ne...

Oct 09, 2026, posted in News

Évoluer aux côtés de l’équipe : les nouveaux locaux prennent forme chez ITW GSE

Notre équipe ne cesse de s’agrandir – et nos locaux s’agrandissent désormais avec nous. Cet été, il y avait de quoi s’émerveiller depuis les...