search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

septembre 23, 2016

AXA 2400 Installed at London Heathrow Airport

ITW GSE AXA Power’s UK Service Partner, JLC Aviation Services Ltd, have recently completed the upgrade of 3 x British Airways stands serving their B787-8 fleet of aircraft at their principal Maintenance Base at Heathrow Airport.

The photo shows 2 x AXA 2400 90 kVA GPUs  together with a cable crocodile which was retained from the former installation. An A380 aircraft supplies the background scenery!

A total of 6 x AXA 2400 90 kVA GPUs and 2 x AXA 90 kVA mobiles complete this project and compliment more than 60 AXA GPUs already in active service across the site

.

More news

Juin 18, 2026, posted in News

ITW GSE Power Share Named Product Leader of the Year

Award-winning innovation for the electric ramp We are proud to announce that Power Share has been named Product Leader of the Year by Ground...

Juin 12, 2026, posted in News

Les objectifs de durabilité des aéroports de l’UE stimulent la demande en solutions PCA flexibles

Les aéroports européens sont soumis à une pression croissante pour réduire leurs émissions, améliorer leur efficacité énergétique et accélérer la transition vers des opérations...

Juin 12, 2026, posted in News

Offre d’emploi – Coordinateur des pièces de rechange

C’est l’occasion de rejoindre notre équipe ! Nous recherchons un coordinateur des pièces de rechange supplémentaire pour rejoindre notre équipe d’assistance basée à Odense,...

Juin 12, 2026, posted in News

Dans les coulisses : comprendre le parcours des pièces de rechange

La livraison de la bonne pièce de rechange au bon endroit et au bon moment est un élément essentiel du soutien aux opérations aéroportuaires...