search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
preloader

juin 12, 2019

Big shipment for huge Bangkok project

By 2020, the air traffic of Bangkok enters a new beginning, when the new Satellite terminal opens in Bangkok’s Suvarnabhumi Airport. The new terminal allows the airport to handle approx. 65 million passengers, and makes it one of the biggest international airports in Southeast Asia and a regional hub for aviation.

ITW GSE has the honor of supplying Ground Power Units and Pre-Conditioned Air units to this great project. During these days, we are shipping off 36 pieces of PCA units (210/4) and 72 pieces of Power Coils.

This great project is based the good cooperation between ITW GSE and Bangkok’s Suvarnabhumi Airport, as GPUs from ITW GSE are already installed at the current terminal, where the units have proven to be reliable and requiring low maintenance, hereby ensuring a maximum uptime.

We look forward to seeing the new units up and running in the new Satellite terminal.

 

 

 

More news

Fév 24, 2026, posted in News

Se développer pour l’avenir

Célébrons le bon travail d’expansion des installations de production ! Cette semaine, nous avons honoré la fière tradition de marquer que la structure du...

Fév 24, 2026, posted in News

Puissance : le progrès à l’aéroport de Leeds Bradford

L’aéroport de Leeds Bradford (LBA) poursuit ses ambitions net-zéro en installant une nouvelle solution d’alimentation des portes d’embarquement comprenant 8 x ITW GSE 2400...

Fév 24, 2026, posted in News

Réflexion sur une Année remarquable

En cette fin d’année 2025, nous tenons à remercier chaleureusement nos partenaires, nos clients et nos homologues du monde entier. Tout au long de...

Fév 24, 2026, posted in News

Célébrer la saison – un pull à la fois

Chez ITW GSE, les fêtes de fin d’année ne se limitent pas aux réflexions de fin d’année : c’est aussi le moment de se...