search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
preloader

novembre 17, 2016

Dublin Airport Have Confidence in AXA

On November 15th, we were delighted to welcome 4 gentlemen from Dublin for the Factory Acceptance Test of 3 x GPUs destined for installation at Dublin Airport’s Terminal 3. The FAT was supervised by Sr. Project Manager, Brian Hou Nielsen and Area Manager Kevin J. Smith.

For the photos session, the gentlemen decided to gather around their new AXA 2400 mobile unit which will accompany 2 x AXA Power Coils for installation on Stand 307. During the small break, the airport personnel told that they felt very confident in AXA and the AXA products after their visit at the factory and the tests performed by Service & Commissioning Engineer Chris Ringvig.

Visit from Dublin Airport
Visit from Dublin Airport

Photos shows from left to right
Paul O’Boyle, Dublin
Kevin Smith, AXA Power
John Kelly, Dublin
Conor Clancy Specialist Technical Engineering Services
Brian Hou Nielsen, AXA Power
Damien Garry, Dublin

More news

Fév 24, 2026, posted in News

Se développer pour l’avenir

Célébrons le bon travail d’expansion des installations de production ! Cette semaine, nous avons honoré la fière tradition de marquer que la structure du...

Fév 24, 2026, posted in News

Puissance : le progrès à l’aéroport de Leeds Bradford

L’aéroport de Leeds Bradford (LBA) poursuit ses ambitions net-zéro en installant une nouvelle solution d’alimentation des portes d’embarquement comprenant 8 x ITW GSE 2400...

Fév 24, 2026, posted in News

Réflexion sur une Année remarquable

En cette fin d’année 2025, nous tenons à remercier chaleureusement nos partenaires, nos clients et nos homologues du monde entier. Tout au long de...

Fév 24, 2026, posted in News

Célébrer la saison – un pull à la fois

Chez ITW GSE, les fêtes de fin d’année ne se limitent pas aux réflexions de fin d’année : c’est aussi le moment de se...