search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
Power by the Hour
preloader

November 17, 2016

Dublin Airport Have Confidence in AXA

On November 15th, we were delighted to welcome 4 gentlemen from Dublin for the Factory Acceptance Test of 3 x GPUs destined for installation at Dublin Airport’s Terminal 3. The FAT was supervised by Sr. Project Manager, Brian Hou Nielsen and Area Manager Kevin J. Smith.

For the photos session, the gentlemen decided to gather around their new AXA 2400 mobile unit which will accompany 2 x AXA Power Coils for installation on Stand 307. During the small break, the airport personnel told that they felt very confident in AXA and the AXA products after their visit at the factory and the tests performed by Service & Commissioning Engineer Chris Ringvig.

Visit from Dublin Airport
Visit from Dublin Airport

Photos shows from left to right
Paul O’Boyle, Dublin
Kevin Smith, AXA Power
John Kelly, Dublin
Conor Clancy Specialist Technical Engineering Services
Brian Hou Nielsen, AXA Power
Damien Garry, Dublin

More news

Mar 08, 2023, posted in News

International Women’s Day

EMBRACE EQUITY When we embrace equity, we embrace diversity, and we embrace inclusion. Equality is the goal, and equity is the means to get...

Mar 01, 2023, posted in News

EcoGate – linking gate equipment into an integrated, intelligent system

New solution unleashes up to 50% surplus power by interlinking gate equipment. ITW GSE has launched a set of technologies that enables individual ground...

Feb 01, 2023, posted in News

We’re hiring! Innovative Mechanical Engineer

Are you a creative, passionate, and innovative person, who seeks product differentiation and challenges the state of the art? Can you take a product...

Jan 31, 2023, posted in News

7400 eGPU Testimonial from BAE System

This is why the military is using electric ground power units “The CO2, the NOx, the fumes, the noise and obviously the saving of...