search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

November 17, 2016

Dublin Airport Have Confidence in AXA

On November 15th, we were delighted to welcome 4 gentlemen from Dublin for the Factory Acceptance Test of 3 x GPUs destined for installation at Dublin Airport’s Terminal 3. The FAT was supervised by Sr. Project Manager, Brian Hou Nielsen and Area Manager Kevin J. Smith.

For the photos session, the gentlemen decided to gather around their new AXA 2400 mobile unit which will accompany 2 x AXA Power Coils for installation on Stand 307. During the small break, the airport personnel told that they felt very confident in AXA and the AXA products after their visit at the factory and the tests performed by Service & Commissioning Engineer Chris Ringvig.

Visit from Dublin Airport
Visit from Dublin Airport

Photos shows from left to right
Paul O’Boyle, Dublin
Kevin Smith, AXA Power
John Kelly, Dublin
Conor Clancy Specialist Technical Engineering Services
Brian Hou Nielsen, AXA Power
Damien Garry, Dublin

More news

Sep 08, 2026, posted in News

More than aircraft power: 7400 eGPU adds AUX outlets

The battery capacity in an eGPU can do more than supply 400 Hz aircraft power. With new optional AUX outlets, the ITW GSE 7400...

Aug 31, 2026, posted in News

Celebrating 40 years with ITW GSE

Congratulations to Kim Koustrup Pedersen on four decades of dedication, technical expertise and commitment to ITW GSE ITW GSE just celebrated an impressive milestone...

Aug 27, 2026, posted in News

Celebrating Josie’s contributions at ITW GSE

After two productive months with our US production team, we recently said goodbye to our Process Engineering Intern, Josie P.   During her 4-months...

Aug 20, 2026, posted in News

Team Spirit on the Move at the DHL Relay

Once again, colleagues from across ITW GSE came together for the annual DHL Relay in Odense – an evening that combines exercise, friendly competition...