search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

juillet 22, 2019

Power To Lyon Airport

To ensure a smooth 400 Hz supply to all stands, Lyon airport will soon replace their 5 semi-centralized systems by 20 pcs of 90 kVA ITW GSE 2400 GPUs. The new 400 Hz units, equipped with the Plug&Play feature that automatically regulates the voltage at the aircraft plug, will be placed close to the point-of-use.

During the factory test that took place in the presence of M. Gilles Robert, M. Julien Castaldi and M. Paul Enri Flesch from Lyon Airport, the ISO 6858 requirements with regard to balanced and unbalanced loads were verified and proved.

For many years, Lyon Airport has been a loyal customer and today, the airport has more than 50 pcs of 400 Hz GPUs from ITW plus a number of 28 VDC units as well.

Congratulations to the airport with their choice of the One Converter – One Plug concept for the semi-centralized stands. We hope that the steady supply leave you time to do other jobs.

To ensure a smooth 400 Hz supply to all stands, Lyon airport will soon replace their 5 semi-centralized systems by 20 pcs of 90 kVA ITW GSE 2400 GPUs. The new 400 Hz units, equipped with the Plug&Play feature that automatically regulates the voltage at the aircraft plug, will be placed close to the point-of-use.

Congratulations to the airport with their choice of the One Converter – One Plug concept for the semi-centralized stands. We hope that the steady supply leave you time to do other jobs.

Factory Acceptance Test ITW GSE 2400 GPUs for Lyon Airport
Julien Castaldi, Lyon Airport and Alain Gargou monitoring the performance of the ITW GSE 2400 GPU

More news

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...

Mar 24, 2026, posted in News

How Airports Can Electrify Gates Without Expanding Grid Capacity

Electrify airport gates without major infrastructure upgrades. Learn how coordinated power management optimizes existing grid capacity. Optimizing infrastructure before investing in major upgrades Airport...

Mar 17, 2026, posted in News

Giving Battery Packaging a Second Life

At ITW GSE, reducing environmental impact is not only about the products we deliver. It is also about how we handle the materials that...

Fév 24, 2026, posted in News

Se développer pour l’avenir

Célébrons le bon travail d’expansion des installations de production ! Cette semaine, nous avons honoré la fière tradition de marquer que la structure du...