search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

juillet 22, 2019

Power To Lyon Airport

To ensure a smooth 400 Hz supply to all stands, Lyon airport will soon replace their 5 semi-centralized systems by 20 pcs of 90 kVA ITW GSE 2400 GPUs. The new 400 Hz units, equipped with the Plug&Play feature that automatically regulates the voltage at the aircraft plug, will be placed close to the point-of-use.

During the factory test that took place in the presence of M. Gilles Robert, M. Julien Castaldi and M. Paul Enri Flesch from Lyon Airport, the ISO 6858 requirements with regard to balanced and unbalanced loads were verified and proved.

For many years, Lyon Airport has been a loyal customer and today, the airport has more than 50 pcs of 400 Hz GPUs from ITW plus a number of 28 VDC units as well.

Congratulations to the airport with their choice of the One Converter – One Plug concept for the semi-centralized stands. We hope that the steady supply leave you time to do other jobs.

To ensure a smooth 400 Hz supply to all stands, Lyon airport will soon replace their 5 semi-centralized systems by 20 pcs of 90 kVA ITW GSE 2400 GPUs. The new 400 Hz units, equipped with the Plug&Play feature that automatically regulates the voltage at the aircraft plug, will be placed close to the point-of-use.

Congratulations to the airport with their choice of the One Converter – One Plug concept for the semi-centralized stands. We hope that the steady supply leave you time to do other jobs.

Factory Acceptance Test ITW GSE 2400 GPUs for Lyon Airport
Julien Castaldi, Lyon Airport and Alain Gargou monitoring the performance of the ITW GSE 2400 GPU

More news

Mai 22, 2026, posted in News

EU Airport Sustainability Goals Increase Demand for Flexible PCA Solutions

Airports across Europe are under increasing pressure to reduce emissions, improve energy efficiency, and accelerate the transition away from fossil-fuel-powered ground operations. New EU...

Mai 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

Mai 12, 2026, posted in News

Baden-Airpark GmbH investit dans des convertisseurs électriques au sol pour réduire les émissions de l’aéroport.

ITW GSE est fier de soutenir Baden-Airpark GmbH (FKB Airport) dans l’avancement de sa stratégie de réduction des émissions aéroportuaires avec la livraison de...

Mai 12, 2026, posted in News

Les bases aériennes modernes nécessitent plus qu’une infrastructure – elles ont besoin d’un soutien au sol intégré.

L’évolution de l’aviation militaire s’accompagne de celle des exigences imposées à l’infrastructure des bases aériennes. Les nouveaux hangars et installations ne sont qu’une partie...