search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

novembre 21, 2024

Solving the electric infrastructure challenges

Watch Senior Sales Manager, Jose Manuel De Las Heras reveal our new charging solutions.

Some airports lack eGSE charging possibilities due to grid limitations, but most electric GPUs have excess electrical capacity at the input due to many aircraft not drawing a full load. The Power Share lets you use that excess power from the grid without having to upgrade the gate infrastrucutre as it distributes the power efficiently to your eGPU or other charging applications. Combining an ITW GSE 2400 GPU with a Power Share allows more 50/60Hz AC equipment to be charged even when the GPU is supplying 400Hz power to the aircraft.

power share and 7400 eGPU

The eGPUs now have the option of an AC Type two inlet that eases the charging in the cases where airports already have installed AC wall chargers incl. cables. Soon, a CCS2 DC inlet will also be an option to the 7400 eGPU.

 

Watch the video to hear Jose explain about the different solutions that we showcase at this year’s GSE Expo Europe in Lisbon

 

The latest addition to our charging solutions is the DC Charger, which lets you charge your high-voltage eGSE. It features two 60 kW (CCS2) outlets and can be connected to an ITW GSE 2400 GPU, which controls how much power the charger has available. This means you don’t need to upgrade your existing infrastructure – and it fits seamlessly into a complete eGPU family for aviation

Martin Walsted poses with ITW GSE’s new DC Charger
Martin Walsted, Key Account Manager, posing with the ITW GSE DC Charger at GSE Expo Europe

 

More news

Oct 30, 2026, posted in News

Une unité, deux services : comment l’eGPU ITW GSE 7400 alimente l’avion et recharge l’eGSE

L’électrification soulève une question pratique pour les exploitants d’aéroport et les prestataires d’assistance en escale : où et quand les équipements électriques seront-ils rechargés,...

Oct 23, 2026, posted in News

Au-delà du prix d’achat : l’analyse du CTP pour une flotte d’eGPU

Lorsque l’on compare un convertisseur au sol diesel conventionnel à un eGPU, il est facile de se concentrer sur le prix d’achat. Mais pour...

Oct 09, 2026, posted in News

La capacité du réseau est limitée ? Exploitez la puissance disponible au niveau des portes

À mesure que les aéroports et les prestataires de services au sol électrifient un nombre croissant d’équipements de Ground Support Equipment, la capacité de...

Oct 09, 2026, posted in News

Offre d’emploi : Ingénieur de maintenance sur site

Nous recherchons un nouveau collaborateur pour notre équipe d’assistance aux États-Unis. Serait-ce vous ? Vos missions quotidiennes comprendront un large éventail de tâches, tant...