search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Descargar folletos
Power by the Hour
preloader

noviembre 21, 2024

Solving the electric infrastructure challenges

Watch Senior Sales Manager, Jose Manuel De Las Heras reveal our new charging solutions.

Some airports lack eGSE charging possibilities due to grid limitations, but most electric GPUs have excess electrical capacity at the input due to many aircraft not drawing a full load. The Power Share lets you use that excess power from the grid without having to upgrade the gate infrastrucutre as it distributes the power efficiently to your eGPU or other charging applications. Combining an ITW GSE 2400 GPU with a Power Share allows more 50/60Hz AC equipment to be charged even when the GPU is supplying 400Hz power to the aircraft.

power share and 7400 eGPU

The eGPUs now have the option of an AC Type two inlet that eases the charging in the cases where airports already have installed AC wall chargers incl. cables. Soon, a CCS2 DC inlet will also be an option to the 7400 eGPU.

 

Watch the video to hear Jose explain about the different solutions that we showcase at this year’s GSE Expo Europe in Lisbon

 

The latest addition to our charging solutions is the DC Charger, which lets you charge your high-voltage eGSE. It features two 60 kW (CCS2) outlets and can be connected to an ITW GSE 2400 GPU, which controls how much power the charger has available. This means you don’t need to upgrade your existing infrastructure – and it fits seamlessly into a complete eGPU family for aviation

Martin Walsted poses with ITW GSE’s new DC Charger
Martin Walsted, Key Account Manager, posing with the ITW GSE DC Charger at GSE Expo Europe

 

More news

Nov 13, 2026, posted in News

Cómo preparar su eGPU para el invierno: dos consejos de mantenimiento esenciales

Con la bajada de las temperaturas, el clima invernal puede suponer retos adicionales para las operaciones en tierra de los aeropuertos. Preparar su unidad...

Nov 13, 2026, posted in News

Mejora del flujo de producción en ITW GSE en Odense

Una nueva perspectiva en la planta de producción es solo una parte de las mejoras continuas en nuestras instalaciones de producción en Odense, Dinamarca....

Oct 30, 2026, posted in News

Una unidad, dos servicios: cómo la eGPU ITW GSE 7400 ofrece energía para aeronaves y carga de eGSE

La electrificación plantea una cuestión práctica para los operadores aeroportuarios y los handlers: ¿dónde y cuándo se cargará el equipo eléctrico, sin necesidad de...

Oct 23, 2026, posted in News

Mirar más allá del precio de compra: el argumento del TCO para una flota de eGPU

Al comparar una Ground Power Unit diésel convencional con una GPU eléctrica, es fácil centrarse en el precio de compra. Pero, en equipos que...