search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Descargar folletos
Power by the Hour
preloader

mayo 26, 2010

AdP approves design of AXA Ground Power Unit for S4 Project

AXA Power is going to deliver 46 pcs of 90 kVA ground power units for the new Terminal S4 in Paris Charles de Gaulle Airport. The terminal will be taken into operation in Spring 2012. Today, M. Hayere and M. Gibert from AdP witnessed the test of the prototype and approved the design. Also present was M. Lefèvre from Shenzhen Tianda in Paris as well as AXA Power’s French Sales Manager Bernard Kosmider.

Test_ADP_May_10.png

 

 

More news

Ago 05, 2026, posted in News

Mantén el ritmo de las operaciones de mantenimiento con conexiones de cable fiables

En la rampa, una mala conexión puede convertirse rápidamente en un problema operativo.   La alimentación eléctrica en tierra de las aeronaves debe ser...

Ago 05, 2026, posted in News

Todo gira en torno a las conexiones. ¿Estás listo para crear las tuyas?

(Puesto vacante)   Conexiones entre aeropuertos y aerolíneas. Entre tecnología y rendimiento. Entre clientes y socios de confianza. Y, lo más importante, entre gente...

Ago 05, 2026, posted in News

Apoyando un nuevo hito en la aviación de ultra largo recorrido

Se está perfilando un nuevo referente en los viajes de ultralarga distancia, ya que Qantas se prepara para presentar su avión Airbus A350-1000 Ultra...

Jul 10, 2026, posted in News

ITW GSE Power Share, nombrado «Producto líder del año»

Innovación galardonada para la rampa eléctrica Nos enorgullece anunciar que Power Share ha sido nombrado «Líder de producto del año» por Ground Support Worldwide....