search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Power by the Hour
preloader

junio 12, 2019

Big shipment for huge Bangkok project

By 2020, the air traffic of Bangkok enters a new beginning, when the new Satellite terminal opens in Bangkok’s Suvarnabhumi Airport. The new terminal allows the airport to handle approx. 65 million passengers, and makes it one of the biggest international airports in Southeast Asia and a regional hub for aviation.

ITW GSE has the honor of supplying Ground Power Units and Pre-Conditioned Air units to this great project. During these days, we are shipping off 36 pieces of PCA units (210/4) and 72 pieces of Power Coils.

This great project is based the good cooperation between ITW GSE and Bangkok’s Suvarnabhumi Airport, as GPUs from ITW GSE are already installed at the current terminal, where the units have proven to be reliable and requiring low maintenance, hereby ensuring a maximum uptime.

We look forward to seeing the new units up and running in the new Satellite terminal.

 

 

 

More news

Nov 21, 2024, posted in News

Solving the electric infrastructure challenges

Watch Senior Sales Manager, Jose Manuel De Las Heras reveal our new charging solutions. Some airports lack eGSE charging possibilities due to grid limitations,...

Nov 19, 2024, posted in News

Is your eGPU ready for winter?

Here’s how to keep it performing at its best in colder months!  Perform Pre-Winter Maintenance: Start with a comprehensive check of the eGPU’s battery,...

Oct 10, 2024, posted in News

dnata adds 14 electric ground power units (GPUs) to Dubai fleet

US$ four million investment is part of air services provider’s ongoing efforts to move away from fossil-fuel engines New equipment to reduce fuel consumption...

Sep 26, 2024, posted in News

Power Back to the Grid!

‘Recycling’ energy from quality tests is now going full scale! Back in March, we announced that we had started ‘recycling’ the power used during...