search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Descargar folletos
Power by the Hour
preloader

agosto 12, 2015

FAT – Zhengzhou Airport, China

Zhengzhou Airport

We are pleased to annonce that we have succesfully performed Factory Acceptance Test on a large order for Zhengzhou Airport, China of 83 Power Coil 2400.
The AXA 2400 Power Coil is based on the ITW GSE design and provides all performance features from the well-known AXA 2400 Compact GPU i.e. the unique voltage quality and the 400% overload at output as a standard. Further, it is equipped with the smart ITW GSE user interface. And software can be updated via USB. The Power Coil also includes standard overload capabilities that match all types of aircraft even those requiring Power Factor 1 like the B787/A350/A380.
The group included:
Mr. Zhou Haijun, Mr Sin Xinhua, Mr. Zhang Zhiwei, Mr Liu Junfeng, Mr. Shang Zhongxing, Mr Fan Lei, Mr. Liu Jiangfeng, Mr Quang Ji.
From AXA Power Project Manager Jan Sørensen and from ITW GSE Singapore General Manager Phua Kia How

More news

Abr 14, 2026, posted in News

Noida International Airport prepares for take-off with electrified gate operations

As Noida International Airport moves closer to inauguration, a key part of its operational setup is already in place: electrified gate infrastructure designed to...

Abr 07, 2026, posted in News

How can the ground handling industry become more sustainable?

Sustainability is becoming a key priority across aviation, and ground handling plays an important role in reducing emissions at airports. While much attention is...

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...

Mar 24, 2026, posted in News

How Airports Can Electrify Gates Without Expanding Grid Capacity

Electrify airport gates without major infrastructure upgrades. Learn how coordinated power management optimizes existing grid capacity. Optimizing infrastructure before investing in major upgrades Airport...