search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Descargar folletos
Power by the Hour
preloader

noviembre 23, 2016

Kuwait Airways install AXA 2400 GPUs

Photo showing Mr. Dsouza, Mr. Al Mazidi from Kuwait Airways to the right David Feuga, Claus Frydenlund Hansen and René Vang Sørensen (to the left)
Photo showing Mr. Dsouza, Mr. Al Mazidi from Kuwait Airways to the right
David Feuga, Claus Frydenlund Hansen and René Vang Sørensen (to the left)

Kuwait Airways has operated AXA GPUs since the 1990ies! Therefore, it was with great pleasure that we received Eng. Ali Al Mazidi; Senior Expert Construction & Maintenance and Rocky Dsouza; Facility Management Engineer for the Factory Acceptance Test of 8 pcs of the AXA 2400 90kVA GPUs earlier this week. The units will be used in Kuwait Airway’s maintenance hangar that will for instance accommodate the A350 in a near future.
The compatibility with the A350, the facts that the AXA 2400 GPUs are of the latest technology which also includes a unique voltage at output due to the Plug & Play system + that the 2400 units are compact and easy to maintain are some of the reasons why Kuwait Airways chose the AXA 2400 GPUs. During the visit, Mr. Al Mazidi and Mr. Dsouza also had the opportunity to get a thorough introduction to the AXA Power Coil and the AXA Power PCA that would be ideal products for the future development of Kuwait Int’l Airport.

More news

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...

Mar 24, 2026, posted in News

How Airports Can Electrify Gates Without Expanding Grid Capacity

Electrify airport gates without major infrastructure upgrades. Learn how coordinated power management optimizes existing grid capacity. Optimizing infrastructure before investing in major upgrades Airport...

Mar 17, 2026, posted in News

Giving Battery Packaging a Second Life

At ITW GSE, reducing environmental impact is not only about the products we deliver. It is also about how we handle the materials that...

Feb 24, 2026, posted in News

Ampliar para el futuro

¡Celebrando el buen trabajo de ampliación de las instalaciones de producción! Esta semana, hemos honrado la orgullosa tradición de señalar que la estructura de...