search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

septembre 29, 2015

AXA GPUs to supply the President’s B787

Presidential B787 aircraft

The Presidential Flight has been a loyal customer since 2003. In 2014, we started a replacement program in the old facility accommodating the Presidential B787 aircraft. The two 90 kW AXA2400 GPUs supplied at that occassion, have performed very well with the B787 which is one of the aircraft requiring PF1. Therefore, the Presidential Flight also wanted AXA units for the new hangar.

The AXA 2400 Compact GPU provides valuable features among other the unique voltage quality and  400% overload at output as a standard. Therefore, it matches all types of aircraft even those requiring Power Factor 1 like the B787/A350/A380.. Further, the AXA 2400 is equipped with the smart ITW GSE user interface and it enables software update via USB.

We are pleased to announce that we have successfully performed the Factory Acceptance Test of 10 fixed 90kW AXA 2400 GPUs for a new Presidential Flight hangar project under construction in Abu Dhabi also regarding the B787 aircraft.

Present at the FAT were:
Mr. M Abdulla Hamad Abdullatif, Facilities Director, Presidential Flight
Mr. A Maqbool,  Mechanical Engineer, Presidential Flight
Mr. P Brennan, Construction Manager, Amana Contracting & Steel Bldg.
Mr. V Krishnakumar, Project engineer, Cavotec Middle East

More news

Avr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Avr 22, 2026, posted in News

Les 5 principales procédures de maintenance annuelle de votre eGSE

Nous comprenons qu’étant donné que votre eGSE contient peu de pièces mobiles et des modules de batterie scellés, l’entretien est très limité. Cependant, il...

Avr 22, 2026, posted in News

Extension de nos installations en Europe !

Pour répondre à la demande mondiale croissante d’équipements de Ground Support Equipment durables, nous augmentons notre capacité de production européenne de 50 % et...

Avr 22, 2026, posted in News

Un choix intelligent en entrée : Les eGPUs ITW GSE 7400 à l’aéroport de Naples

Cet été, nous avons eu le plaisir de nous rendre à l’aéroport de Naples pour observer les performances de nos convertisseursseurs électriques au sol...