search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

September 29, 2015

AXA GPUs to supply the President’s B787

Presidential B787 aircraft

The Presidential Flight has been a loyal customer since 2003. In 2014, we started a replacement program in the old facility accommodating the Presidential B787 aircraft. The two 90 kW AXA2400 GPUs supplied at that occassion, have performed very well with the B787 which is one of the aircraft requiring PF1. Therefore, the Presidential Flight also wanted AXA units for the new hangar.

The AXA 2400 Compact GPU provides valuable features among other the unique voltage quality and  400% overload at output as a standard. Therefore, it matches all types of aircraft even those requiring Power Factor 1 like the B787/A350/A380.. Further, the AXA 2400 is equipped with the smart ITW GSE user interface and it enables software update via USB.

We are pleased to announce that we have successfully performed the Factory Acceptance Test of 10 fixed 90kW AXA 2400 GPUs for a new Presidential Flight hangar project under construction in Abu Dhabi also regarding the B787 aircraft.

Present at the FAT were:
Mr. M Abdulla Hamad Abdullatif, Facilities Director, Presidential Flight
Mr. A Maqbool,  Mechanical Engineer, Presidential Flight
Mr. P Brennan, Construction Manager, Amana Contracting & Steel Bldg.
Mr. V Krishnakumar, Project engineer, Cavotec Middle East

More news

Juli 16, 2026, posted in News

Keep Turnarounds Moving with Reliable Cable Connections

On the ramp, a poor connection can quickly become an operational problem.   Aircraft ground power must be reliable, easy to handle, and ready...

Juli 10, 2026, posted in News

ITW GSE Power Share zum „Produktführer des Jahres“ gekürt

Preisgekrönte Innovation für die elektrische Rampe Wir sind stolz darauf, bekannt geben zu dürfen, dass Power Share von „Ground Support Worldwide“ausgezeichnet wurde. Mit dieser...

Juli 10, 2026, posted in News

Ein Tag im Zeichen von Sicherheit, Sensibilisierung und Teamarbeit

Bei ITW GSE ist Sicherheit eine gemeinsame Verantwortung. Unsere Philosophie ist einfach: Alle Unfälle lassen sich vermeiden, wenn wir aufmerksam bleiben, uns zu Wort...

Juli 10, 2026, posted in News

Mehr Raum für Wachstum bei ITW GSE

ITW GSE wächst weiter – und mit ihm auch unsere Standorte. Nach der kürzlich erfolgten Erweiterung unseres Produktionsstandorts um 2.300 m² bauen wir nun...