search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

novembre 02, 2017

2400 GPUs on their way to Bahrain Int’l Airport

Last week, we welcomed a delegation representing Bahrain International Airport.
The objective of the visit was to perform a Factory Acceptance Test on the AXA 2400 fixed GPUs that are going to be part of an Airport Modernization Program.

Present were:
SHAJIMON KUTTAPPAN; Hill International ME
BADER SHAWQI MAHMOOD HUSSAIN ALMAHMOOD; Bahrain Airport Company
JAFFAR HUSAIN JAWAD JAFFAR; Bahrain Airport Company
ALI RIZA ZENGIN; TAV Construction
JEAN-PHILIPPE DA GRACA SIMOES; ADPI

Project Manager Claus Frydenlund Hansen (left) and Service and Commissioning Engineer Jeyalingam Kathirgamathambi (second from left) conducted the succesful testing of one of the 20 pcs of 2400 GPUs that are now on their way to Bahrain International Airport.

More news

Août 20, 2026, posted in News

Team Spirit on the Move at the DHL Relay

Once again, colleagues from across ITW GSE came together for the annual DHL Relay in Odense – an evening that combines exercise, friendly competition...

Août 19, 2026, posted in News

Swivel Connector Solves Kinks at the Aircraft Connection Point

Efficient aircraft ground servicing depends on the safe and reliable transfer of fuel, air, and other utility services between ground support equipment (GSE) and...

Août 05, 2026, posted in News

Assurez la fluidité des cycles de production grâce à des connexions par câble fiables

Sur la rampe, un mauvais raccordement peut rapidement se transformer en problème opérationnel.   L’alimentation au sol des avions doit être fiable, facile à...

Août 05, 2026, posted in News

Contribuer à une nouvelle étape importante dans le domaine de l’aviation ultra-long-courrier

Une nouvelle référence en matière de vols ultra-long-courriers est en train de voir le jour, alors que Qantas s’apprête à mettre en service son...