search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

November 02, 2017

2400 GPUs on their way to Bahrain Int’l Airport

Last week, we welcomed a delegation representing Bahrain International Airport.
The objective of the visit was to perform a Factory Acceptance Test on the AXA 2400 fixed GPUs that are going to be part of an Airport Modernization Program.

Present were:
SHAJIMON KUTTAPPAN; Hill International ME
BADER SHAWQI MAHMOOD HUSSAIN ALMAHMOOD; Bahrain Airport Company
JAFFAR HUSAIN JAWAD JAFFAR; Bahrain Airport Company
ALI RIZA ZENGIN; TAV Construction
JEAN-PHILIPPE DA GRACA SIMOES; ADPI

Project Manager Claus Frydenlund Hansen (left) and Service and Commissioning Engineer Jeyalingam Kathirgamathambi (second from left) conducted the succesful testing of one of the 20 pcs of 2400 GPUs that are now on their way to Bahrain International Airport.

More news

Sep 30, 2026, posted in News

Looking for more GSE knowledge?

Ground support operations are changing. Electrification, charging infrastructure, aircraft power and cooling, and sustainability are just some of the topics shaping the decisions airports,...

Sep 24, 2026, posted in News

Open job position: Field Service Engineer

We are looking for an additional team member for our US Support team – are you the one? Your daily tasks will include a...

Sep 17, 2026, posted in News

Limited grid capacity? Put available gate power to work

As airports and ground handlers electrify more Ground Support Equipment, charging capacity can quickly become a challenge. ITW GSE Power Share is designed to...

Sep 08, 2026, posted in News

More than aircraft power: 7400 eGPU adds AUX outlets

The battery capacity in an eGPU can do more than supply 400 Hz aircraft power. With new optional AUX outlets, the ITW GSE 7400...