search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

November 02, 2017

2400 GPUs on their way to Bahrain Int’l Airport

Last week, we welcomed a delegation representing Bahrain International Airport.
The objective of the visit was to perform a Factory Acceptance Test on the AXA 2400 fixed GPUs that are going to be part of an Airport Modernization Program.

Present were:
SHAJIMON KUTTAPPAN; Hill International ME
BADER SHAWQI MAHMOOD HUSSAIN ALMAHMOOD; Bahrain Airport Company
JAFFAR HUSAIN JAWAD JAFFAR; Bahrain Airport Company
ALI RIZA ZENGIN; TAV Construction
JEAN-PHILIPPE DA GRACA SIMOES; ADPI

Project Manager Claus Frydenlund Hansen (left) and Service and Commissioning Engineer Jeyalingam Kathirgamathambi (second from left) conducted the succesful testing of one of the 20 pcs of 2400 GPUs that are now on their way to Bahrain International Airport.

More news

May 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

May 07, 2026, posted in News

Modern air bases require more than infrastructure — they require integrated ground support

As military aviation evolves, so do the demands placed on air base infrastructure. New hangars and facilities are only part of the equation. Ensuring...

Apr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....