search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

mars 28, 2018

It’s all about connections

When it comes to connections it was today confirmed by RATE, our Australian distributor. RATE has delivered quite some of ITW GSEs equipment to Perth Airport over the years. PCAs and Power Coils among others. They have an onsite presence and do  maintain all of the ITW GSE equipment plus the aerobridges and the VDGS.

Because of the good service and the on-site presence. RATE recently was awarded the contract of installing some 2400 Power Coils in Perth. Units that will be servicing B787 aircraft for a number of international carriers.

Due to the fixed “T”head types of aerobridge in use in Perth, the airport elected to go for ground mounted Power Coils in the initial phase. A smart solution as the Power Coils can easily be retrofitted, should the airport decide to replace the T-head bridges by apron drive style PBBs.

The Power Coil installation also included a billing system so that the airport can utilize a user pay system for power consumption.  Except from the Power Coils, RATE designed and installed all components, distribution cabinet, billing system and 50Hz cabling.
It is indeed all about connections.

More news

Mai 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

Mai 12, 2026, posted in News

Baden-Airpark GmbH investit dans des convertisseurs électriques au sol pour réduire les émissions de l’aéroport.

ITW GSE est fier de soutenir Baden-Airpark GmbH (FKB Airport) dans l’avancement de sa stratégie de réduction des émissions aéroportuaires avec la livraison de...

Mai 12, 2026, posted in News

Les bases aériennes modernes nécessitent plus qu’une infrastructure – elles ont besoin d’un soutien au sol intégré.

L’évolution de l’aviation militaire s’accompagne de celle des exigences imposées à l’infrastructure des bases aériennes. Les nouveaux hangars et installations ne sont qu’une partie...

Avr 22, 2026, posted in News

Les 5 principales procédures de maintenance annuelle de votre eGSE

Nous comprenons qu’étant donné que votre eGSE contient peu de pièces mobiles et des modules de batterie scellés, l’entretien est très limité. Cependant, il...