search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

März 28, 2018

It’s all about connections

When it comes to connections it was today confirmed by RATE, our Australian distributor. RATE has delivered quite some of ITW GSEs equipment to Perth Airport over the years. PCAs and Power Coils among others. They have an onsite presence and do  maintain all of the ITW GSE equipment plus the aerobridges and the VDGS.

Because of the good service and the on-site presence. RATE recently was awarded the contract of installing some 2400 Power Coils in Perth. Units that will be servicing B787 aircraft for a number of international carriers.

Due to the fixed “T”head types of aerobridge in use in Perth, the airport elected to go for ground mounted Power Coils in the initial phase. A smart solution as the Power Coils can easily be retrofitted, should the airport decide to replace the T-head bridges by apron drive style PBBs.

The Power Coil installation also included a billing system so that the airport can utilize a user pay system for power consumption.  Except from the Power Coils, RATE designed and installed all components, distribution cabinet, billing system and 50Hz cabling.
It is indeed all about connections.

More news

Mai 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

Mai 12, 2026, posted in News

Baden-Airpark GmbH investiert in elektrische GPUs zur Reduzierung von Flughafenemissionen

ITW GSE ist stolz darauf, die Baden-Airpark GmbH (FKB Airport) mit der Lieferung von zehn ITW GSE 7400 elektrischen GPUs (electric ground power units)...

Mai 12, 2026, posted in News

Moderne Luftwaffenstützpunkte brauchen mehr als nur Infrastruktur – sie brauchen integrierte Bodenunterstützung

Mit der Entwicklung der militärischen Luftfahrt steigen auch die Anforderungen an die Infrastruktur der Flugplätze. Neue Hangars und Einrichtungen sind dabei nur ein Teil...

Apr. 22, 2026, posted in News

Die 5 wichtigsten jährlichen Wartungsmaßnahmen für Ihre eGSE

Da Ihr eGSE nur wenige bewegliche Teile und versiegelte Batteriemodule enthält, ist die Wartung sehr gering. Es gibt jedoch 5 Dinge, die Sie in...