search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

décembre 18, 2018

Suvarnabumi Airport goes all in

Bangkok’s new Suvarnabumi Airport goes all in with ITW GSE 2400 Power Coil and 3400 PCA!
72 pcs of Power Coils including a 400 Hz Ground Power Supply and a cable retriever in each unit and 36 pcs of Pre-Conditioned Air units (210/4) will power and cool aircraft parked at the Bangkok Survarnabhumi Satellite Terminal.
As part of Bangkok’s Suvarnabhumi airport’s development, the construction of its Satellite terminal will allow the airport to handle approximately 85 million passengers a year once completed in 2020.
ITW GSE units have already been installed at the current terminal and have proven to be reliable thus ensuring maximum uptime.

More news

Juin 24, 2026, posted in News

A day dedicated to safety, awareness, and teamwork

At ITW GSE, safety is a shared responsibility. Our philosophy is simple: all accidents can be prevented when we stay aware, speak up, and...

Juin 18, 2026, posted in News

ITW GSE Power Share Named Product Leader of the Year

Award-winning innovation for the electric ramp We are proud to announce that Power Share has been named Product Leader of the Year by Ground...

Juin 12, 2026, posted in News

Les objectifs de durabilité des aéroports de l’UE stimulent la demande en solutions PCA flexibles

Les aéroports européens sont soumis à une pression croissante pour réduire leurs émissions, améliorer leur efficacité énergétique et accélérer la transition vers des opérations...

Juin 12, 2026, posted in News

Offre d’emploi – Coordinateur des pièces de rechange

C’est l’occasion de rejoindre notre équipe ! Nous recherchons un coordinateur des pièces de rechange supplémentaire pour rejoindre notre équipe d’assistance basée à Odense,...