search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

Dezember 18, 2018

Suvarnabumi Airport goes all in

Bangkok’s new Suvarnabumi Airport goes all in with ITW GSE 2400 Power Coil and 3400 PCA!
72 pcs of Power Coils including a 400 Hz Ground Power Supply and a cable retriever in each unit and 36 pcs of Pre-Conditioned Air units (210/4) will power and cool aircraft parked at the Bangkok Survarnabhumi Satellite Terminal.
As part of Bangkok’s Suvarnabhumi airport’s development, the construction of its Satellite terminal will allow the airport to handle approximately 85 million passengers a year once completed in 2020.
ITW GSE units have already been installed at the current terminal and have proven to be reliable thus ensuring maximum uptime.

More news

Okt. 09, 2026, posted in News

Offene Stelle: Außendiensttechniker

Wir suchen ein weiteres Teammitglied für unser US-Support-Team – sind Sie die richtige Person dafür? Zu Ihren täglichen Aufgaben gehört ein breites Spektrum an...

Okt. 09, 2026, posted in News

Begrenzte Netzkapazität? Nutzen Sie die verfügbare Leistung an den Einspeisepunkten

Da Flughäfen und Bodenabfertigungsunternehmen immer mehr Ground Support Equipment elektrifizieren, kann die Ladekapazität schnell zu einer Herausforderung werden. ITW GSE Power Share wurde entwickelt,...

Okt. 09, 2026, posted in News

Möchten Sie mehr über GSE erfahren?

Die Bodenabfertigung befindet sich im Wandel. Elektrifizierung, Ladeinfrastruktur, Stromversorgung und Kühlung von Flugzeugen sowie Nachhaltigkeit sind nur einige der Themen, die die Entscheidungen von...

Okt. 09, 2026, posted in News

Gemeinsam mit dem Team wachsen: Bei ITW GSE nehmen die neuen Büroräume Gestalt an

Unser Team ist gewachsen – und nun wachsen auch unsere Räumlichkeiten mit uns. Im Laufe des Sommers gab es direkt vor den Fenstern von...