search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

juillet 26, 2010

Visit from Taiwan, Province of China

Factory Acceptance Test
of GPUs for Taipei International Airport

Taiwan_July_2010.jpg

Last week, we had the pleasure of welcoming

Mr. Lin, Tung-Chou WIST
Mr. Tsai, Yu-Ching, Taiwan Int’l Airport
Mr. Yu, Meng-Hsien Taiwan Int’l Airport
Mr. Tsou, Hsin-Tung, Taiwan Multico ( AXA Power Distributor)
Mr. Chen Kuan-Hung, Company IEEC
Mr. Huang, Li-Kuei Taiwan Multico
Mr. Wu, Chia-Hsuan WIST

The gentlemen witnessed the factory acceptance test of the 28 pcs of AXA Power GPUs to be installed in Taipei International Airport shortly.

More news

Août 05, 2026, posted in News

Assurez la fluidité des cycles de production grâce à des connexions par câble fiables

Sur la rampe, un mauvais raccordement peut rapidement se transformer en problème opérationnel.   L’alimentation au sol des avions doit être fiable, facile à...

Août 05, 2026, posted in News

Contribuer à une nouvelle étape importante dans le domaine de l’aviation ultra-long-courrier

Une nouvelle référence en matière de vols ultra-long-courriers est en train de voir le jour, alors que Qantas s’apprête à mettre en service son...

Août 05, 2026, posted in News

Tout est une question de relations. Êtes-vous prêt à tisser les vôtres ?

(Offre d’emploi)   Des liens entre les aéroports et les compagnies aériennes. Entre la technologie et la performance. Entre les clients et des partenaires...

Juil 10, 2026, posted in News

ITW GSE Power Share désigné « Produit phare de l’année »

Une innovation primée pour la rampe électrique Nous sommes fiers d’annoncer que Power Share a été désigné « Leader produit de l’année » par...