search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

Juli 26, 2010

Visit from Taiwan, Province of China

Factory Acceptance Test
of GPUs for Taipei International Airport

Taiwan_July_2010.jpg

Last week, we had the pleasure of welcoming

Mr. Lin, Tung-Chou WIST
Mr. Tsai, Yu-Ching, Taiwan Int’l Airport
Mr. Yu, Meng-Hsien Taiwan Int’l Airport
Mr. Tsou, Hsin-Tung, Taiwan Multico ( AXA Power Distributor)
Mr. Chen Kuan-Hung, Company IEEC
Mr. Huang, Li-Kuei Taiwan Multico
Mr. Wu, Chia-Hsuan WIST

The gentlemen witnessed the factory acceptance test of the 28 pcs of AXA Power GPUs to be installed in Taipei International Airport shortly.

More news

Juli 10, 2026, posted in News

ITW GSE Power Share zum „Produktführer des Jahres“ gekürt

Preisgekrönte Innovation für die elektrische Rampe Wir sind stolz darauf, bekannt geben zu dürfen, dass Power Share von „Ground Support Worldwide“ausgezeichnet wurde. Mit dieser...

Juli 10, 2026, posted in News

Ein Tag im Zeichen von Sicherheit, Sensibilisierung und Teamarbeit

Bei ITW GSE ist Sicherheit eine gemeinsame Verantwortung. Unsere Philosophie ist einfach: Alle Unfälle lassen sich vermeiden, wenn wir aufmerksam bleiben, uns zu Wort...

Juli 10, 2026, posted in News

Mehr Raum für Wachstum bei ITW GSE

ITW GSE wächst weiter – und mit ihm auch unsere Standorte. Nach der kürzlich erfolgten Erweiterung unseres Produktionsstandorts um 2.300 m² bauen wir nun...

Juni 12, 2026, posted in News

Offene Stelle – Koordinator für Ersatzteile

Jetzt ist Ihre Chance, Teil unseres Teams zu werden! Wir suchen einen weiteren Ersatzteilkoordinator für unser Support-Team in Odense, Dänemark. Als Ersatzteilkoordinator arbeiten Sie...