search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Descargar folletos
Power by the Hour
preloader

septiembre 29, 2016

Aviatransprocess Certifies AXA 2400 Range and AXA Cable Retriever

Last week, certification and FAT for 3 x AXA 2400, 120 kVA GPUs & 2 x AXA Cable Retrievers was conducted by Mr. Dmitry Lushin from Aviatransprocess at our factory in Odense. The whole process went smoothly. Within long, the GPUs and Cable Retrievers will be installed in Sheremetyevo Airport (Moscow) by ITW GSE distributor AEGE.

As always, it was a true pleasure for us to host distributors and guests. However, this time the entire AXA team was especially happy to welcome Alexander back at our facility – and Olga whom we have not seen for quite some time!

From left to right: Jeyalingam Kathirgamathambi, Martin Walsted, Jesper Nielsen ITW GSE AXA Power, Alexander Korytnikov, AEGE, Dmitry Lushin, Aviatransprocess & Olga Sergeeva AEGE
From left to right: Jeyalingam Kathirgamathambi, Martin Walsted,
Jesper Nielsen ITW GSE AXA Power, Alexander Shevchenko, AEGE, Dmitry Lushin, Aviatransprocess & Olga Sergeeva AEGE

 

More news

Abr 14, 2026, posted in News

Noida International Airport prepares for take-off with electrified gate operations

As Noida International Airport moves closer to inauguration, a key part of its operational setup is already in place: electrified gate infrastructure designed to...

Abr 07, 2026, posted in News

How can the ground handling industry become more sustainable?

Sustainability is becoming a key priority across aviation, and ground handling plays an important role in reducing emissions at airports. While much attention is...

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...

Mar 24, 2026, posted in News

How Airports Can Electrify Gates Without Expanding Grid Capacity

Electrify airport gates without major infrastructure upgrades. Learn how coordinated power management optimizes existing grid capacity. Optimizing infrastructure before investing in major upgrades Airport...