search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
Power by the Hour
preloader

September 29, 2016

Aviatransprocess Certifies AXA 2400 Range and AXA Cable Retriever

Last week, certification and FAT for 3 x AXA 2400, 120 kVA GPUs & 2 x AXA Cable Retrievers was conducted by Mr. Dmitry Lushin from Aviatransprocess at our factory in Odense. The whole process went smoothly. Within long, the GPUs and Cable Retrievers will be installed in Sheremetyevo Airport (Moscow) by ITW GSE distributor AEGE.

As always, it was a true pleasure for us to host distributors and guests. However, this time the entire AXA team was especially happy to welcome Alexander back at our facility – and Olga whom we have not seen for quite some time!

From left to right: Jeyalingam Kathirgamathambi, Martin Walsted, Jesper Nielsen ITW GSE AXA Power, Alexander Korytnikov, AEGE, Dmitry Lushin, Aviatransprocess & Olga Sergeeva AEGE
From left to right: Jeyalingam Kathirgamathambi, Martin Walsted,
Jesper Nielsen ITW GSE AXA Power, Alexander Shevchenko, AEGE, Dmitry Lushin, Aviatransprocess & Olga Sergeeva AEGE

 

More news

Apr 21, 2022, posted in News

Celebrating the 100th unit of eGPU 90 kVA!

Hurray! Today, we celebrated the 100th produced unit of 90 kVA battery GPU, the ITW GSE 7400 eGPU. This unit is sold to TCR,...

Apr 05, 2022, posted in News

Proper Aircraft Cable Tension

The tension in the sockets of a GPU cable head are critical to the safety of the operators, equipment, and aircraft. Cables should be...

Mar 01, 2022, posted in News

Proud to present our Model Factory

Our facility is a true “model factory” in every aspect. From the Inlining of all assembly lines where products flow through from start to...

Feb 10, 2022, posted in News

Changing the Abrasion Resistance End Cap

Watch how easy it is to change an ITW GSE Abrasion Resistant End Cap!    These 400 Hz replaceable caps are made of a...