search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Descargar folletos
Power by the Hour
preloader

abril 27, 2016

Successful Factory Accceptance Test for ATR

ATR, Airbus and Fauche Technologies has participated in the Factory Acceptance Test of 7 x 400 Hz AXA 2400 &  7 x AXA 1400 28 VDC Ground Power Units. The units will power the ATR production in Toulouse. Both ATR and Airbus were very satisfied with the successful FAT as well as the performance of the units.  ATR is looking forward to the delivery soon.

The photo below shows:

Pernille Bo (AXA), Fabien Batut (ATR), Fabrice Cerezo (Fauche Technologies) Brian Hou (AXA), Jérôme Bassedes (AIRBUS), Bernard Kosmider (AXA) and Romain Tardieu (Fauche Technologies)

 

More news

Nov 13, 2026, posted in News

Cómo preparar su eGPU para el invierno: dos consejos de mantenimiento esenciales

Con la bajada de las temperaturas, el clima invernal puede suponer retos adicionales para las operaciones en tierra de los aeropuertos. Preparar su unidad...

Nov 13, 2026, posted in News

Mejora del flujo de producción en ITW GSE en Odense

Una nueva perspectiva en la planta de producción es solo una parte de las mejoras continuas en nuestras instalaciones de producción en Odense, Dinamarca....

Oct 30, 2026, posted in News

Una unidad, dos servicios: cómo la eGPU ITW GSE 7400 ofrece energía para aeronaves y carga de eGSE

La electrificación plantea una cuestión práctica para los operadores aeroportuarios y los handlers: ¿dónde y cuándo se cargará el equipo eléctrico, sin necesidad de...

Oct 23, 2026, posted in News

Mirar más allá del precio de compra: el argumento del TCO para una flota de eGPU

Al comparar una Ground Power Unit diésel convencional con una GPU eléctrica, es fácil centrarse en el precio de compra. Pero, en equipos que...