search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

April 27, 2016

Successful Factory Accceptance Test for ATR

ATR, Airbus and Fauche Technologies has participated in the Factory Acceptance Test of 7 x 400 Hz AXA 2400 &  7 x AXA 1400 28 VDC Ground Power Units. The units will power the ATR production in Toulouse. Both ATR and Airbus were very satisfied with the successful FAT as well as the performance of the units.  ATR is looking forward to the delivery soon.

The photo below shows:

Pernille Bo (AXA), Fabien Batut (ATR), Fabrice Cerezo (Fauche Technologies) Brian Hou (AXA), Jérôme Bassedes (AIRBUS), Bernard Kosmider (AXA) and Romain Tardieu (Fauche Technologies)

 

More news

Sep 08, 2026, posted in News

More than aircraft power: 7400 eGPU adds AUX outlets

The battery capacity in an eGPU can do more than supply 400 Hz aircraft power. With new optional AUX outlets, the ITW GSE 7400...

Aug 31, 2026, posted in News

Celebrating 40 years with ITW GSE

Congratulations to Kim Koustrup Pedersen on four decades of dedication, technical expertise and commitment to ITW GSE ITW GSE just celebrated an impressive milestone...

Aug 27, 2026, posted in News

Celebrating Josie’s contributions at ITW GSE

After two productive months with our US production team, we recently said goodbye to our Process Engineering Intern, Josie P.   During her 4-months...

Aug 20, 2026, posted in News

Team Spirit on the Move at the DHL Relay

Once again, colleagues from across ITW GSE came together for the annual DHL Relay in Odense – an evening that combines exercise, friendly competition...