search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

April 27, 2016

Successful Factory Accceptance Test for ATR

ATR, Airbus and Fauche Technologies has participated in the Factory Acceptance Test of 7 x 400 Hz AXA 2400 &  7 x AXA 1400 28 VDC Ground Power Units. The units will power the ATR production in Toulouse. Both ATR and Airbus were very satisfied with the successful FAT as well as the performance of the units.  ATR is looking forward to the delivery soon.

The photo below shows:

Pernille Bo (AXA), Fabien Batut (ATR), Fabrice Cerezo (Fauche Technologies) Brian Hou (AXA), Jérôme Bassedes (AIRBUS), Bernard Kosmider (AXA) and Romain Tardieu (Fauche Technologies)

 

More news

May 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

May 07, 2026, posted in News

Modern air bases require more than infrastructure — they require integrated ground support

As military aviation evolves, so do the demands placed on air base infrastructure. New hangars and facilities are only part of the equation. Ensuring...

Apr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....