search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

April 27, 2016

Successful Factory Accceptance Test for ATR

ATR, Airbus and Fauche Technologies has participated in the Factory Acceptance Test of 7 x 400 Hz AXA 2400 &  7 x AXA 1400 28 VDC Ground Power Units. The units will power the ATR production in Toulouse. Both ATR and Airbus were very satisfied with the successful FAT as well as the performance of the units.  ATR is looking forward to the delivery soon.

The photo below shows:

Pernille Bo (AXA), Fabien Batut (ATR), Fabrice Cerezo (Fauche Technologies) Brian Hou (AXA), Jérôme Bassedes (AIRBUS), Bernard Kosmider (AXA) and Romain Tardieu (Fauche Technologies)

 

More news

Nov 18, 2026, posted in News

How to Prepare Your eGPU for Winter: Two Essential Maintenance Tips

As temperatures drop, winter weather can bring additional challenges to airport ground operations. Preparing your electric Ground Power Unit (eGPU) for colder conditions is...

Nov 09, 2026, posted in News

Improving production flow at ITW GSE in Odense

A fresh look on the production floor is just one part of the ongoing improvements at our production facility in Odense, Denmark. Following last...

Oct 28, 2026, posted in News

One unit, two services: How the ITW GSE 7400 eGPU supports aircraft power and eGSE charging

Electrification brings a practical question for airport operators and ground handlers: Where and when will electric equipment be charged – without extra trips across...

Oct 21, 2026, posted in News

Looking beyond the purchase price: the TCO case for an eGPU fleet

When comparing a conventional diesel Ground Power Unit with an electric GPU, it is easy to focus on the purchase price. But for equipment...