search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Power by the Hour
preloader

enero 07, 2016

Niño Opeña and Jeyalingam – working together

Actually, it is not only James who works at ITW GSE…

… we are lucky to have a broad, dedicated and talented staff who all sets pride in doing a good job when working in the field or from their base company.
During the month of December, Niño Opeña and Jeyalingam helped each other commissioning and putting into operation 50 AXA Power units i.e. 26 pcs of 400 Hz PBB mounted GPus and 24 pcs of PCA units for the TB2 Project at Cairo International Airport, the largest airport in Egypt.
Company Limak managed the project that was supplied through Thyssen Airport Services (TKAS).

The project started with Cairo Airport Company trying out an AXA unit on their existing TB3 back in 2012. They were so happy about the product performance that they recommended the contractor and the consultant that they would prefer AXA units for the TB2 project. Well, to be honest, the first seed for the TB2 project was laid already in 2009 when Egypt Air, who has their hub in Cairo, started operating AXA units. They recommended our equipment to the airport – and have stayed a very loyal customer with whom it is always a pleasure to do business.

Jeyalingam Kathirgamathambi, ITW GSE Denmark and Niño Opeña, ITW GSE Dubai  – no. 4 and 5 from the left – with local staff in Cairo airport

More news

Nov 21, 2024, posted in News

Solving the electric infrastructure challenges

Watch Senior Sales Manager, Jose Manuel De Las Heras reveal our new charging solutions. Some airports lack eGSE charging possibilities due to grid limitations,...

Nov 19, 2024, posted in News

Is your eGPU ready for winter?

Here’s how to keep it performing at its best in colder months!  Perform Pre-Winter Maintenance: Start with a comprehensive check of the eGPU’s battery,...

Oct 10, 2024, posted in News

dnata adds 14 electric ground power units (GPUs) to Dubai fleet

US$ four million investment is part of air services provider’s ongoing efforts to move away from fossil-fuel engines New equipment to reduce fuel consumption...

Sep 26, 2024, posted in News

Power Back to the Grid!

‘Recycling’ energy from quality tests is now going full scale! Back in March, we announced that we had started ‘recycling’ the power used during...