search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Descargar folletos
Power by the Hour
preloader

junio 04, 2018

2400 Powering the World Cup

The FIFA World Cup 2018 will soon attract many visitors from the whole world. Many of those will arrive – and depart – by plane.

Together with distributor AEGE, we have lately  delivered 51 units  of the 2400 series of 400 Hz Power units in Pulkovo Airport. The 32 of those units  have just been commissioned and are ready to power the planes coming to St. Petersburg. According to the airport staff, the set-up of the units was highly facilitated during the easy to use Plug & Play feature. In fact, it only takes milliseconds for the GPU control unit to automatically identify and analyse numerous cable performance parameters to calculate the voltage drop. Even with more cable types connected as in Pulkovo where the installation passes via a pit.

Since 2006, AEGE has installed more than 1000 of our GPUs all over Russia. In fact, we are present in all airports with connections to the World Cup.

Wishing the world a good World Cup with lots of exiting matches.
May the best team win.

2400 units at Pulkovo Airport, St. Petersburg

More news

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...

Mar 24, 2026, posted in News

How Airports Can Electrify Gates Without Expanding Grid Capacity

Electrify airport gates without major infrastructure upgrades. Learn how coordinated power management optimizes existing grid capacity. Optimizing infrastructure before investing in major upgrades Airport...

Mar 17, 2026, posted in News

Giving Battery Packaging a Second Life

At ITW GSE, reducing environmental impact is not only about the products we deliver. It is also about how we handle the materials that...

Feb 24, 2026, posted in News

Ampliar para el futuro

¡Celebrando el buen trabajo de ampliación de las instalaciones de producción! Esta semana, hemos honrado la orgullosa tradición de señalar que la estructura de...