search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Power by the Hour
preloader

junio 30, 2015

Congratulations Rabat Salé Airport Morocco

Rabat Salé Airport

We congratulate Rabat Salé Airport, Morocco with the upgrade of their new Terminal that was inaugurated in 2012. With 4 new passenger boarding bridges from Tianda, the passengers can walk  comfortably to the aircraft. And the AXA Power Coils that are installed under the bridges will ensure an on-time departure of the flights.

ITW GSE Service Engineer Alain Gargou just sent these nice photos from Morocco where he commissioned the AXA 2300 Power Coils last week.
The terminal is 16,000 m² large and has a maximum capacity of 3.5 million passengers/year

 

 

 

More news

Abr 24, 2025, posted in News

Why Cleaning your PCA matters

How the ITW GSE 3500 PCA Optimizes Performance, Comfort, and Sustainability. Cleaner PCA, Higher Performance In today’s aviation environment, sustainability is not just a...

Abr 03, 2025, posted in News

ITW GSE at Passenger Terminal Expo 2025

ITW GSE at Passenger Terminal Expo 2025 ITW GSE is heading to Frankfurt for Passenger Terminal Expo 2025 – bringing smarter, greener gate solutions...

Mar 17, 2025, posted in News

ITW GSE at Inter Airport Southeast Asia 2025

Advance Your Gate Economics! Join us at Inter Airport Southeast Asia 2025, where our Sales Director for Asia Pacific, Steven Ng, will be sharing...

Mar 12, 2025, posted in News

International Women’s Day

    Imagine a gender equal world. A world free of bias, stereotypes, and discrimination. A world that’s diverse, equitable, and inclusive. A world...